IAC logo
IAC Assessment: UD0689
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0689
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2004
Principal Product metal stamping
NAICS 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 160,000
Annual Production 1,600,000 Pieces
Production Hrs. Annual 4,080
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,067 2,534,911 kWh $0.03
Electricity Demand $89,535 6,960 kW-months/year $12.86
Natural Gas $114,193 12,266 MMBtu $9.31
TOTAL ENERGY COSTS $286,877
RECOMMENDED SAVINGS* $131,111 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,454
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
01: 4.6210 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$28,020
Cost:
$48,560
$741 23,902 - - - - - - - - $27,279 - - - $741
23,902
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$27,279
-
$
-
-
$
02: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$20,849
Cost:
$16,000
$11,616 876 $9,233 297,840 - - - - - - - - - - $11,616
876
kWh
$9,233
297,840
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$20,424
Cost:
-
$678 21,870 - - - - $5,075 551 - - $14,671 - - - $678
21,870
kWh
-
-
kW-months/year
-
-
$
$5,075
551
MMBtu
-
-
lb
$14,671
-
$
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$16,486
Cost:
$23,704
- - - - - - $16,486 1,790 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$16,486
1,790
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,050
Cost:
$27,720
$4,000 128,930 $4,930 372 - - - - $380 - $(-260) - - - $4,000
128,930
kWh
$4,930
372
kW-months/year
-
-
$
-
-
MMBtu
$380
-
lb
$(-260)
-
$
-
-
$
06: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$14,597
Cost:
-
- - - - - - - - - - - - $14,597 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$14,597
-
$
07: 2.8112 COMBINE UTILITY METERS Savings:
$3,895
Cost:
$10,200
- - - - $3,895 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,895
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,140
Cost:
-
$1,390 44,880 $1,750 132 - - - - - - - - - - $1,390
44,880
kWh
$1,750
132
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,082
Cost:
$2,000
- - - - - - $3,082 261 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,082
261
MMBtu
-
-
lb
-
-
$
-
-
$
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,425
Cost:
$2,540
$2,425 78,270 - - - - - - - - - - - - $2,425
78,270
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
11: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,285
Cost:
-
$1,010 32,640 $1,275 96 - - - - - - - - - - $1,010
32,640
kWh
$1,275
96
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
12: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,715
Cost:
$640
$760 24,480 $955 72 - - - - - - - - - - $760
24,480
kWh
$955
72
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
13: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,680
Cost:
-
$820 26,440 $860 65 - - - - - - - - - - $820
26,440
kWh
$860
65
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
14: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,210
Cost:
$2,040
$1,210 17,850 - - - - - - - - - - - - $1,210
17,850
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
15: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,012
Cost:
$1,566
$455 14,689 $557 42 - - - - - - - - - - $455
14,689
kWh
$557
42
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
16: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$911
Cost:
$1,436
- - - - - - $911 130 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$911
130
MMBtu
-
-
lb
-
-
$
-
-
$
17: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$175
Cost:
$58
$50 1,630 $125 10 - - - - - - - - - - $50
1,630
kWh
$125
10
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
18: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$155
Cost:
-
$45 1,430 $110 8 - - - - - - - - - - $45
1,430
kWh
$110
8
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$131,111
Cost:
$136,464
$25,200 417,887 $19,795 298,637 $3,895 - $25,554 2,732 $380 - $41,690 - $14,597 - $25,200
417,887
kWh
$19,795
298,637
kW-months/year
$3,895
-
$
$25,554
2,732
MMBtu
$380
-
lb
$41,690
-
$
$14,597
-
$
TOTAL IMPLEMENTED Savings:
$54,454
Cost:
$49,258
$4,104 132,392 $3,325 251 - - $5,075 551 - - $41,950 - - - $4,104
132,392
kWh
$3,325
251
kW-months/year
-
-
$
$5,075
551
MMBtu
-
-
lb
$41,950
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (haz) Personnel Changes Administrative Changes