IAC logo
IAC Assessment: UD0691
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0691
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2004
Principal Product Flat-rolled steel
NAICS 331221 - Rolled Steel Shape Manufacturing
SIC 3316 - Cold Finishing Of Steel Shapes
Sales $50,000,000-$100,000,000
# of Employees 143
Plant Area (Sq.Ft.) 308,000
Annual Production 128 Tons
Production Hrs. Annual 4,860
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,720 11,781,600 kWh $0.01
Electricity Demand $98,297 11,148 kW-months/year $8.82
Other Energy $85,463 7,431 MMBtu $11.50
TOTAL ENERGY COSTS $323,673
RECOMMENDED SAVINGS* $65,828 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,636
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Energy Personnel Changes Electricity Usage Electricity Demand Electricity Fees Other Energy Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 3.4151 MINIMIZE WATER USAGE Savings:
$20,840
Cost:
$1,380
$140 4,500 - - - - $20,700 1,800 - - $140
4,500
kWh
-
-
kW-months/year
-
-
$
$20,700
1,800
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,415
Cost:
$18,250
$(-15) (-470) - - - - $21,850 1,900 $(-3,420) - $(-15)
(-470)
kWh
-
-
kW-months/year
-
-
$
$21,850
1,900
MMBtu
$(-3,420)
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$6,885
Cost:
$630
$4,135 133,380 $2,750 324 - - - - - - $4,135
133,380
kWh
$2,750
324
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,450
Cost:
$8,600
- - - - $5,450 - - - - - -
-
kWh
-
-
kW-months/year
$5,450
-
$
-
-
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,290
Cost:
$16,271
$3,840 123,864 $1,450 171 - - - - - - $3,840
123,864
kWh
$1,450
171
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7122 DISCONNECT BALLASTS Savings:
$4,541
Cost:
$68
$2,669 86,112 $1,872 221 - - - - - - $2,669
86,112
kWh
$1,872
221
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,530
Cost:
$630
$920 29,640 $610 72 - - - - - - $920
29,640
kWh
$610
72
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$1,020
Cost:
-
$610 19,760 $410 48 - - - - - - $610
19,760
kWh
$410
48
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.7134 USE PHOTOCELL CONTROLS Savings:
$890
Cost:
$220
$890 28,707 - - - - - - - - $890
28,707
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$790
Cost:
-
$464 14,976 $326 38 - - - - - - $464
14,976
kWh
$326
38
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
11: 2.5123 REDUCE FLUID FLOW RATES Savings:
$177
Cost:
-
$104 3,370 $73 9 - - - - - - $104
3,370
kWh
$73
9
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$65,828
Cost:
$46,049
$13,757 443,839 $7,491 883 $5,450 - $42,550 3,700 $(-3,420) - $13,757
443,839
kWh
$7,491
883
kW-months/year
$5,450
-
$
$42,550
3,700
MMBtu
$(-3,420)
-
$
TOTAL IMPLEMENTED Savings:
$14,636
Cost:
$1,548
$9,078 292,815 $5,558 655 - - - - - - $9,078
292,815
kWh
$5,558
655
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Other Energy Personnel Changes Electricity Usage Electricity Demand Electricity Fees Other Energy Personnel Changes