Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2004 |
Principal Product | turbine engine components |
NAICS | 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471 - Plating And Polishing |
Sales | $50,000,000-$100,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 16,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $694,731 | 28,460,672 | kWh | $0.02 |
Electricity Demand | $704,536 | 67,272 | kW-months/year | $10.47 |
Natural Gas | $80,458 | 12,303 | MMBtu | $6.54 |
TOTAL ENERGY COSTS | $1,508,646 | |||
RECOMMENDED SAVINGS* | $858,303 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $356,198 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $318,395 Cost: $324,700 |
$267,723 | 5,006,400 | $50,672 | 3,576 | - | - | - | - | - | - |
$267,723 5,006,400 kWh |
$50,672 3,576 kW-months/year |
- - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $295,125 Cost: - |
$231,190 | 6,533,865 | $63,935 | 4,512 | - | - | - | - | - | - |
$231,190 6,533,865 kWh |
$63,935 4,512 kW-months/year |
- - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $117,513 Cost: $80,244 |
$95,929 | 2,293,212 | $21,584 | 1,524 | - | - | - | - | - | - |
$95,929 2,293,212 kWh |
$21,584 1,524 kW-months/year |
- - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS |
Savings: $57,990 Cost: $114,000 |
- | - | - | - | $57,990 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$57,990 - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $33,763 Cost: $51,348 |
$16,693 | 657,725 | $17,070 | 1,200 | - | - | - | - | - | - |
$16,693 657,725 kWh |
$17,070 1,200 kW-months/year |
- - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7314 REDUCE VENTILATION AIR |
Savings: $18,999 Cost: - |
$153 | 6,643 | $129 | 16 | - | - | $18,717 | 2,862 | - | - |
$153 6,643 kWh |
$129 16 kW-months/year |
- - $ |
$18,717 2,862 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,530 Cost: $5,780 |
$3,440 | 92,200 | $1,090 | 77 | - | - | - | - | - | - |
$3,440 92,200 kWh |
$1,090 77 kW-months/year |
- - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.5112 USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER |
Savings: $4,207 Cost: $3,323 |
- | - | - | - | - | - | - | - | $4,207 | 990 |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$4,207 990 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $3,140 Cost: - |
$1,100 | 48,000 | $2,040 | 144 | - | - | - | - | - | - |
$1,100 48,000 kWh |
$2,040 144 kW-months/year |
- - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,427 Cost: $210 |
$1,018 | 35,284 | $409 | 29 | - | - | - | - | - | - |
$1,018 35,284 kWh |
$409 29 kW-months/year |
- - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $883 Cost: $1,962 |
- | - | - | - | - | - | $883 | 135 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$883 135 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $860 Cost: $845 |
$300 | 13,200 | $560 | 40 | - | - | - | - | - | - |
$300 13,200 kWh |
$560 40 kW-months/year |
- - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $790 Cost: $660 |
$280 | 12,000 | $510 | 36 | - | - | - | - | - | - |
$280 12,000 kWh |
$510 36 kW-months/year |
- - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.7122 DISCONNECT BALLASTS |
Savings: $393 Cost: $13 |
$155 | 6,720 | $238 | 17 | - | - | - | - | - | - |
$155 6,720 kWh |
$238 17 kW-months/year |
- - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE |
Savings: $288 Cost: - |
$67 | 2,925 | $221 | 16 | - | - | - | - | - | - |
$67 2,925 kWh |
$221 16 kW-months/year |
- - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $858,303 Cost: $583,085 |
$618,048 | 14,708,174 | $158,458 | 11,186 | $57,990 | - | $19,600 | 2,997 | $4,207 | 990 | $618,048 14,708,174 kWh |
$158,458 11,186 kW-months/year |
$57,990 - $ |
$19,600 2,997 MMBtu |
$4,207 990 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $356,198 Cost: $59,973 |
$252,996 | 7,347,362 | $83,602 | 5,902 | - | - | $19,600 | 2,997 | - | - | $252,996 7,347,362 kWh |
$83,602 5,902 kW-months/year |
- - $ |
$19,600 2,997 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Liquid (non-haz) |