IAC logo
IAC Assessment: UD0694
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0694
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2004
Principal Product turbine engine components
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 250,000
Annual Production 16,000 Pieces
Production Hrs. Annual 8,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $694,731 28,460,672 kWh $0.02
Electricity Demand $704,536 67,272 kW-months/year $10.47
Natural Gas $80,458 12,303 MMBtu $6.54
TOTAL ENERGY COSTS $1,508,646
RECOMMENDED SAVINGS* $858,303 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $356,198
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ gal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$318,395
Cost:
$324,700
$267,723 5,006,400 $50,672 3,576 - - - - - - $267,723
5,006,400
kWh
$50,672
3,576
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
02: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$295,125
Cost:
-
$231,190 6,533,865 $63,935 4,512 - - - - - - $231,190
6,533,865
kWh
$63,935
4,512
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$117,513
Cost:
$80,244
$95,929 2,293,212 $21,584 1,524 - - - - - - $95,929
2,293,212
kWh
$21,584
1,524
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
04: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$57,990
Cost:
$114,000
- - - - $57,990 - - - - - -
-
kWh
-
-
kW-months/year
$57,990
-
$
-
-
MMBtu
-
-
gal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$33,763
Cost:
$51,348
$16,693 657,725 $17,070 1,200 - - - - - - $16,693
657,725
kWh
$17,070
1,200
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
06: 2.7314 REDUCE VENTILATION AIR Savings:
$18,999
Cost:
-
$153 6,643 $129 16 - - $18,717 2,862 - - $153
6,643
kWh
$129
16
kW-months/year
-
-
$
$18,717
2,862
MMBtu
-
-
gal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,530
Cost:
$5,780
$3,440 92,200 $1,090 77 - - - - - - $3,440
92,200
kWh
$1,090
77
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
08: 2.5112 USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER Savings:
$4,207
Cost:
$3,323
- - - - - - - - $4,207 990 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$4,207
990
gal
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,140
Cost:
-
$1,100 48,000 $2,040 144 - - - - - - $1,100
48,000
kWh
$2,040
144
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,427
Cost:
$210
$1,018 35,284 $409 29 - - - - - - $1,018
35,284
kWh
$409
29
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
11: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$883
Cost:
$1,962
- - - - - - $883 135 - - -
-
kWh
-
-
kW-months/year
-
-
$
$883
135
MMBtu
-
-
gal
12: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$860
Cost:
$845
$300 13,200 $560 40 - - - - - - $300
13,200
kWh
$560
40
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
13: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$790
Cost:
$660
$280 12,000 $510 36 - - - - - - $280
12,000
kWh
$510
36
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
14: 2.7122 DISCONNECT BALLASTS Savings:
$393
Cost:
$13
$155 6,720 $238 17 - - - - - - $155
6,720
kWh
$238
17
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
15: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$288
Cost:
-
$67 2,925 $221 16 - - - - - - $67
2,925
kWh
$221
16
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
TOTAL RECOMMENDED Savings:
$858,303
Cost:
$583,085
$618,048 14,708,174 $158,458 11,186 $57,990 - $19,600 2,997 $4,207 990 $618,048
14,708,174
kWh
$158,458
11,186
kW-months/year
$57,990
-
$
$19,600
2,997
MMBtu
$4,207
990
gal
TOTAL IMPLEMENTED Savings:
$356,198
Cost:
$59,973
$252,996 7,347,362 $83,602 5,902 - - $19,600 2,997 - - $252,996
7,347,362
kWh
$83,602
5,902
kW-months/year
-
-
$
$19,600
2,997
MMBtu
-
-
gal
Savings