Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2004 |
Principal Product | Pretzels and Corn Extruded Products |
NAICS | 331222 - Steel Wire Drawing |
SIC | 2052 - Cookies And Crackers |
Sales | $50,000,000-$100,000,000 |
# of Employees | 240 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 40,000,000 Pieces |
Production Hrs. Annual | 6,490 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $208,461 | 8,297,280 | kWh | $0.03 |
Electricity Demand | $147,742 | 16,164 | kW-months/year | $9.14 |
Natural Gas | $780,411 | 143,968 | MMBtu | $5.42 |
TOTAL ENERGY COSTS | $1,202,941 | |||
RECOMMENDED SAVINGS* | $512,462 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $312,849 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Ancillary Material Cost | One-time Revenue or Avoided Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Ancillary Material Cost | One-time Revenue or Avoided Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $96,000 Cost: $204,300 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | $96,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
$96,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $85,223 Cost: $13,240 |
- | - | - | - | $85,223 | 15,723 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$85,223 15,723 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $297,217 Cost: - |
- | - | - | - | $46,429 | 8,566 | $28,984 | 3,028,309 | $21,804 | 30,283 | - | - | $200,000 | - | - | - |
- - kWh |
- - kW-months/year |
$46,429 8,566 MMBtu |
$28,984 3,028,309 Tgal |
$21,804 30,283 gal |
- - $ |
$200,000 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $18,114 Cost: - |
$14,260 | 570,382 | - | - | $3,854 | 711 | - | - | - | - | - | - | - | - | - | - |
$14,260 570,382 kWh |
- - kW-months/year |
$3,854 711 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7122 DISCONNECT BALLASTS |
Savings: $7,031 Cost: $377 |
$4,329 | 175,219 | $2,702 | 324 | - | - | - | - | - | - | - | - | - | - | - | - |
$4,329 175,219 kWh |
$2,702 324 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,689 Cost: - |
$2,271 | 90,854 | $1,418 | 168 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,271 90,854 kWh |
$1,418 168 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,162 Cost: $8,406 |
$1,947 | 77,880 | $1,215 | 144 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,947 77,880 kWh |
$1,215 144 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $975 Cost: $255 |
$600 | 24,012 | $375 | 48 | - | - | - | - | - | - | - | - | - | - | - | - |
$600 24,012 kWh |
$375 48 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $775 Cost: - |
$413 | 16,500 | $334 | 36 | - | - | - | - | - | - | $28 | - | - | - | - | - |
$413 16,500 kWh |
$334 36 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$28 - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $276 Cost: $890 |
$166 | 6,662 | $110 | 4 | - | - | - | - | - | - | - | - | - | - | - | - |
$166 6,662 kWh |
$110 4 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $512,462 Cost: $227,468 |
$23,986 | 961,509 | $6,154 | 724 | $135,506 | 25,000 | $28,984 | 3,028,309 | $21,804 | 30,283 | $28 | - | $200,000 | - | $96,000 | - | $23,986 961,509 kWh |
$6,154 724 kW-months/year |
$135,506 25,000 MMBtu |
$28,984 3,028,309 Tgal |
$21,804 30,283 gal |
$28 - $ |
$200,000 - $ |
$96,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $312,849 Cost: $9,038 |
$9,560 | 384,465 | $6,044 | 720 | $46,429 | 8,566 | $28,984 | 3,028,309 | $21,804 | 30,283 | $28 | - | $200,000 | - | - | - | $9,560 384,465 kWh |
$6,044 720 kW-months/year |
$46,429 8,566 MMBtu |
$28,984 3,028,309 Tgal |
$21,804 30,283 gal |
$28 - $ |
$200,000 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Ancillary Material Cost | One-time Revenue or Avoided Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Ancillary Material Cost | One-time Revenue or Avoided Cost | Increase in Production |