IAC logo
IAC Assessment: UD0707
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0707
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2004
Principal Product Hard Chrome Plating of Automotive Dies
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3741 -
Sales $10,000,000-$50,000,000
# of Employees 67
Plant Area (Sq.Ft.) 69,000
Annual Production 32 Thousand Feet
Production Hrs. Annual 8,736
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $138,529 3,637,106 kWh $0.04
Electricity Demand $158,837 8,872 kW-months/year $17.90
Natural Gas $154,363 22,729 MMBtu $6.79
TOTAL ENERGY COSTS $462,005
RECOMMENDED SAVINGS* $135,443 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,384
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$63,251
Cost:
$782
- - - - - - - - $63,251 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$63,251
-
$
-
-
$
02: 2.2514 COVER OPEN TANKS Savings:
$27,270
Cost:
$4,326
- - - - $27,270 3,636 - - - - - - -
-
kWh
-
-
kW-months/year
$27,270
3,636
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,956
Cost:
$31,342
$9,423 336,518 $10,141 456 - - $(-576) - - - $968 - $9,423
336,518
kWh
$10,141
456
kW-months/year
-
-
MMBtu
$(-576)
-
$
-
-
$
$968
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$11,671
Cost:
$46,000
$2,698 96,360 $2,936 132 - - $2,736 - - - $3,301 - $2,698
96,360
kWh
$2,936
132
kW-months/year
-
-
MMBtu
$2,736
-
$
-
-
$
$3,301
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,960
Cost:
-
- - - - $6,960 928 - - - - - - -
-
kWh
-
-
kW-months/year
$6,960
928
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,078
Cost:
$15,000
- - - - $4,078 544 - - - - - - -
-
kWh
-
-
kW-months/year
$4,078
544
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,158
Cost:
$245
$555 19,823 $603 27 - - - - - - - - $555
19,823
kWh
$603
27
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$827
Cost:
$1,000
- - - - $827 110 - - - - - - -
-
kWh
-
-
kW-months/year
$827
110
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$272
Cost:
$750
$112 5,242 $160 7 - - - - - - - - $112
5,242
kWh
$160
7
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$135,443
Cost:
$99,445
$12,788 457,943 $13,840 622 $39,135 5,218 $2,160 - $63,251 - $4,269 - $12,788
457,943
kWh
$13,840
622
kW-months/year
$39,135
5,218
MMBtu
$2,160
-
$
$63,251
-
$
$4,269
-
$
TOTAL IMPLEMENTED Savings:
$48,384
Cost:
$35,913
$9,978 356,341 $10,744 483 $27,270 3,636 $(-576) - - - $968 - $9,978
356,341
kWh
$10,744
483
kW-months/year
$27,270
3,636
MMBtu
$(-576)
-
$
-
-
$