IAC Assessment: UD0710
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0710
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2005
Principal Product Fuel Rails
NAICS 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 320
Plant Area (Sq.Ft.) 130,000
Annual Production 3,900,000 Pieces
Production Hrs. Annual 6,336
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $419,485 7,973,400 kWh $0.05
Electricity Demand $136,955 13,476 kW-months/year $10.16
Natural Gas $103,632 14,817 MMBtu $6.99
TOTAL ENERGY COSTS $682,292
RECOMMENDED SAVINGS* $265,087 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $247,059
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$215,424
Cost:
$120,000
- - - - - - $215,424 - -
-
kWh
-
-
kW-months/year
-
-
$
$215,424
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,746
Cost:
$56,952
$20,733 482,170 $9,013 913 - - - - $20,733
482,170
kWh
$9,013
913
kW-months/year
-
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,824
Cost:
$9,000
- - $8,824 894 - - - - -
-
kWh
$8,824
894
kW-months/year
-
-
$
-
-
$
04: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$3,908
Cost:
$2,080
$2,724 63,360 $1,184 120 - - - - $2,724
63,360
kWh
$1,184
120
kW-months/year
-
-
$
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,385
Cost:
-
$3,385 78,720 - - - - - - $3,385
78,720
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,911
Cost:
$500
$1,362 31,680 $549 60 - - - - $1,362
31,680
kWh
$549
60
kW-months/year
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,172
Cost:
$2,964
$817 19,008 $355 36 - - - - $817
19,008
kWh
$355
36
kW-months/year
-
-
$
-
-
$
08: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$717
Cost:
-
- - - - $717 - - - -
-
kWh
-
-
kW-months/year
$717
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$265,087
Cost:
$191,496
$29,021 674,938 $19,925 2,023 $717 - $215,424 - $29,021
674,938
kWh
$19,925
2,023
kW-months/year
$717
-
$
$215,424
-
$
TOTAL IMPLEMENTED Savings:
$247,059
Cost:
$179,916
$21,550 501,178 $9,368 949 $717 - $215,424 - $21,550
501,178
kWh
$9,368
949
kW-months/year
$717
-
$
$215,424
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes