IAC logo
IAC Assessment: UD0711
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0711
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2005
Principal Product Electroplated and coated steel
NAICS 331221 - Rolled Steel Shape Manufacturing
SIC 3316 - Cold Finishing Of Steel Shapes
Sales $50,000,000-$100,000,000
# of Employees 160
Plant Area (Sq.Ft.) 350,000
Annual Production 170,000 Tons
Production Hrs. Annual 4,800
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $699,719 13,531,789 kWh $0.05
Natural Gas $524,089 122,265 MMBtu $4.29
Other Gas $469,607 116,767 MMBtu $4.02
TOTAL ENERGY COSTS $1,949,352
RECOMMENDED SAVINGS* $647,805 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,769
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Ancillary Material Cost Water Consumption Electricity Usage Natural Gas Water Disposal Ancillary Material Cost Water Consumption
$ kWh $ MMBtu $ Tgal $ $ $ Tgal
01: 3.4153 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER Savings:
$343,339
Cost:
$10,000
- - - - $7,831 1,728,000 $335,508 - - - -
-
kWh
-
-
MMBtu
$7,831
1,728,000
Tgal
$335,508
-
$
-
-
Tgal
02: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$143,601
Cost:
$246,784
$(-343) (-6,726) $141,843 31,949 - - - - $2,101 - $(-343)
(-6,726)
kWh
$141,843
31,949
MMBtu
-
-
Tgal
-
-
$
$2,101
-
Tgal
03: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$113,328
Cost:
$400,000
$70,992 1,392,000 $42,336 9,600 - - - - - - $70,992
1,392,000
kWh
$42,336
9,600
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,341
Cost:
$80,215
$20,655 405,000 - - - - $2,686 - - - $20,655
405,000
kWh
-
-
MMBtu
-
-
Tgal
$2,686
-
$
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,813
Cost:
$2,025
$13,813 270,840 - - - - - - - - $13,813
270,840
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,651
Cost:
$1,240
$4,651 91,200 - - - - - - - - $4,651
91,200
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$4,427
Cost:
$600
$4,427 86,800 - - - - - - - - $4,427
86,800
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,305
Cost:
$3,530
- - $1,305 296 - - - - - - -
-
kWh
$1,305
296
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$647,805
Cost:
$744,394
$114,195 2,239,114 $185,484 41,845 $7,831 1,728,000 $338,194 - $2,101 - $114,195
2,239,114
kWh
$185,484
41,845
MMBtu
$7,831
1,728,000
Tgal
$338,194
-
$
$2,101
-
Tgal
TOTAL IMPLEMENTED Savings:
$19,769
Cost:
$6,795
$18,464 362,040 $1,305 296 - - - - - - $18,464
362,040
kWh
$1,305
296
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $ $ Tgal