IAC Assessment: UD0719
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0719
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2005
Principal Product Plastic Injected Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 260
Plant Area (Sq.Ft.) 185,000
Annual Production 11,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,428 5,295,620 kWh $0.03
Electricity Demand $134,283 12,588 kW-months/year $10.67
Natural Gas $50,296 6,133 MMBtu $8.20
TOTAL ENERGY COSTS $341,323
RECOMMENDED SAVINGS* $92,929 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,305
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Other Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$41,821
Cost:
$11,000
$41,821 1,493,617 - - - - - - - - $41,821
1,493,617
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$25,553
Cost:
$24,000
- - - - $25,553 - - - - - -
-
kWh
-
-
kW-months/year
$25,553
-
$
-
-
MMBtu
-
-
$
03: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$13,165
Cost:
$20,000
- - - - $14,165 - - - $(-1,000) - -
-
kWh
-
-
kW-months/year
$14,165
-
$
-
-
MMBtu
$(-1,000)
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,580
Cost:
$4,800
- - - - $3,580 - - - - - -
-
kWh
-
-
kW-months/year
$3,580
-
$
-
-
MMBtu
-
-
$
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,455
Cost:
$12,060
$2,260 80,728 $1,195 116 - - - - - - $2,260
80,728
kWh
$1,195
116
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,173
Cost:
$3,498
$1,252 44,725 $921 84 - - - - - - $1,252
44,725
kWh
$921
84
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.7122 DISCONNECT BALLASTS Savings:
$1,102
Cost:
$75
$635 22,680 $467 48 - - - - - - $635
22,680
kWh
$467
48
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$583
Cost:
-
$336 12,000 $247 24 - - - - - - $336
12,000
kWh
$247
24
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$583
Cost:
$20
$336 12,000 $247 24 - - - - - - $336
12,000
kWh
$247
24
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$485
Cost:
$970
$1,626 33,938 - - - - $(-1,141) 116 - - $1,626
33,938
kWh
-
-
kW-months/year
-
-
$
$(-1,141)
116
MMBtu
-
-
$
11: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$429
Cost:
-
- - - - $429 - - - - - -
-
kWh
-
-
kW-months/year
$429
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$92,929
Cost:
$76,423
$48,266 1,699,688 $3,077 296 $43,727 - $(-1,141) 116 $(-1,000) - $48,266
1,699,688
kWh
$3,077
296
kW-months/year
$43,727
-
$
$(-1,141)
116
MMBtu
$(-1,000)
-
$
TOTAL IMPLEMENTED Savings:
$18,305
Cost:
$32,155
$3,231 115,408 $1,909 188 $14,165 - - - $(-1,000) - $3,231
115,408
kWh
$1,909
188
kW-months/year
$14,165
-
$
-
-
MMBtu
$(-1,000)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Other Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Other Gas Personnel Changes