IAC Assessment: UD0739
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0739
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2006
Principal Product Metal Fabrication
NAICS 331221 - Rolled Steel Shape Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 39
Plant Area (Sq.Ft.) 60,000
Annual Production 245,000 Pieces
Production Hrs. Annual 3,168
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,649 976,500 kWh $0.03
Electricity Demand $43,367 3,276 kW-months/year $13.24
Natural Gas $21,742 2,710 MMBtu $8.02
TOTAL ENERGY COSTS $96,758
RECOMMENDED SAVINGS* $66,927 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,276
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.632 CHANGE OPERATING CONDITIONS Savings:
$41,626
Cost:
$4,000
- - - - - - $12,670 - $28,956 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,670
-
$
$28,956
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$11,417
Cost:
$3,300
- - - - $11,417 920 - - - - -
-
kWh
-
-
kW-months/year
$11,417
920
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,822
Cost:
$23,400
$2,403 65,894 $3,309 252 - - $110 - - - $2,403
65,894
kWh
$3,309
252
kW-months/year
-
-
MMBtu
$110
-
$
-
-
$
04: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$3,397
Cost:
-
- - - - $3,397 273 - - - - -
-
kWh
-
-
kW-months/year
$3,397
273
MMBtu
-
-
$
-
-
$
05: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$1,391
Cost:
$30
$208 6,627 $500 38 $683 55 - - - - $208
6,627
kWh
$500
38
kW-months/year
$683
55
MMBtu
-
-
$
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,049
Cost:
$387
$400 12,913 $649 48 - - - - - - $400
12,913
kWh
$649
48
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$873
Cost:
$1,900
$333 10,746 $540 36 - - - - - - $333
10,746
kWh
$540
36
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$600
Cost:
-
$229 7,380 $371 24 - - - - - - $229
7,380
kWh
$371
24
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$539
Cost:
$540
$93 2,957 $446 34 - - - - - - $93
2,957
kWh
$446
34
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$109
Cost:
-
- - - - $109 9 - - - - -
-
kWh
-
-
kW-months/year
$109
9
MMBtu
-
-
$
-
-
$
11: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$104
Cost:
-
- - - - $104 8 - - - - -
-
kWh
-
-
kW-months/year
$104
8
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$66,927
Cost:
$33,557
$3,666 106,517 $5,815 432 $15,710 1,265 $12,780 - $28,956 - $3,666
106,517
kWh
$5,815
432
kW-months/year
$15,710
1,265
MMBtu
$12,780
-
$
$28,956
-
$
TOTAL IMPLEMENTED Savings:
$48,276
Cost:
$4,417
$837 26,920 $1,520 110 $4,293 345 $12,670 - $28,956 - $837
26,920
kWh
$1,520
110
kW-months/year
$4,293
345
MMBtu
$12,670
-
$
$28,956
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product