IAC Assessment: UD0740
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0740
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2006
Principal Product Automatic Interior Trim/Steering Wheels/Airbags
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3079 -
Sales $100,000,000-$500,000,000
# of Employees 700
Plant Area (Sq.Ft.) 465,000
Annual Production 19,700,000 Units
Production Hrs. Annual 6,360
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $898,306 34,350,596 kWh $0.03
Electricity Demand $838,180 5,466 kW-months/year $153.34
Natural Gas $367,660 42,248 MMBtu $8.70
TOTAL ENERGY COSTS $2,173,839
RECOMMENDED SAVINGS* $367,807 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $231,267
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$65,164
Cost:
$258,960
$31,495 1,431,611 $29,551 2,700 - - - - $4,118 - $31,495
1,431,611
kWh
$29,551
2,700
kW-months/year
-
-
MMBtu
-
-
$
$4,118
-
$
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$107,569
Cost:
$256,000
$54,401 2,472,768 $53,168 4,860 - - - - - - $54,401
2,472,768
kWh
$53,168
4,860
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$56,879
Cost:
$252,100
$7,768 356,000 $8,739 804 - - $40,372 - - - $7,768
356,000
kWh
$8,739
804
kW-months/year
-
-
MMBtu
$40,372
-
$
-
-
$
04: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$45,101
Cost:
$17,030
- - - - $45,101 5,184 - - - - -
-
kWh
-
-
kW-months/year
$45,101
5,184
MMBtu
-
-
$
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$42,737
Cost:
-
$3,891 176,887 - - $38,846 4,465 - - - - $3,891
176,887
kWh
-
-
kW-months/year
$38,846
4,465
MMBtu
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,847
Cost:
$52,400
$7,040 320,000 $8,807 804 - - - - - - $7,040
320,000
kWh
$8,807
804
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,352
Cost:
$2,280
$8,976 408,000 $6,376 588 - - - - - - $8,976
408,000
kWh
$6,376
588
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$10,428
Cost:
$10,000
$5,702 259,200 $4,726 432 - - - - - - $5,702
259,200
kWh
$4,726
432
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,096
Cost:
-
$2,284 36,888 $812 204 - - - - - - $2,284
36,888
kWh
$812
204
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,805
Cost:
$1,500
$989 44,954 $1,816 168 - - - - - - $989
44,954
kWh
$1,816
168
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,326
Cost:
$1,700
$672 30,528 $654 60 - - - - - - $672
30,528
kWh
$654
60
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
12: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,280
Cost:
-
$1,280 58,320 - - - - - - - - $1,280
58,320
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
13: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$223
Cost:
-
- - - - - - $223 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$223
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$367,807
Cost:
$851,970
$124,498 5,595,156 $114,649 10,620 $83,947 9,649 $40,595 - $4,118 - $124,498
5,595,156
kWh
$114,649
10,620
kW-months/year
$83,947
9,649
MMBtu
$40,595
-
$
$4,118
-
$
TOTAL IMPLEMENTED Savings:
$231,267
Cost:
$513,580
$80,261 3,584,345 $71,565 6,684 $38,846 4,465 $40,595 - - - $80,261
3,584,345
kWh
$71,565
6,684
kW-months/year
$38,846
4,465
MMBtu
$40,595
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material