Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2006 |
Principal Product | Fan Systems |
NAICS | 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3564 - Blowers And Fans |
Sales | $10,000,000-$50,000,000 |
# of Employees | 131 |
Plant Area (Sq.Ft.) | 81,600 |
Annual Production | 897,300 Pieces |
Production Hrs. Annual | 6,732 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $161,900 | 2,700,000 | kWh | $0.06 |
Natural Gas | $145,800 | 11,640 | MMBtu | $12.53 |
TOTAL ENERGY COSTS | $315,420 | |||
RECOMMENDED SAVINGS* | $281,179 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $34,922 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $182,400 Cost: $85,000 |
- | - | - | - | - | - | - | - | $182,400 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$182,400 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.625 DEVELOP STANDARD OPERATING PROCEDURES |
Savings: $29,600 Cost: $32,000 |
- | - | - | - | - | - | $29,600 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$29,600 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD |
Savings: $23,000 Cost: $1,200 |
- | - | - | - | $23,000 | 1,836 | - | - | - | - |
- - kWh |
- - kW-months/year |
$23,000 1,836 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $20,997 Cost: $22,960 |
$19,132 | 390,456 | $1,865 | 696 | - | - | - | - | - | - |
$19,132 390,456 kWh |
$1,865 696 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,322 Cost: $14,256 |
$4,418 | 90,155 | $431 | 156 | - | - | - | - | $473 | - |
$4,418 90,155 kWh |
$431 156 kW-months/year |
- - MMBtu |
- - $ |
$473 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $4,800 Cost: $9,030 |
- | - | - | - | $4,800 | 382 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,800 382 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,215 Cost: $1,995 |
$2,929 | 59,780 | $286 | 108 | - | - | - | - | - | - |
$2,929 59,780 kWh |
$286 108 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $3,095 Cost: $760 |
- | - | - | - | $3,095 | 247 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,095 247 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,678 Cost: - |
$2,441 | 49,817 | $237 | 84 | - | - | - | - | - | - |
$2,441 49,817 kWh |
$237 84 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,554 Cost: $4,920 |
$2,273 | 49,397 | $174 | 60 | - | - | - | - | $107 | - |
$2,273 49,397 kWh |
$174 60 kW-months/year |
- - MMBtu |
- - $ |
$107 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,209 Cost: $1,800 |
$1,107 | 22,485 | $102 | 36 | - | - | - | - | - | - |
$1,107 22,485 kWh |
$102 36 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $920 Cost: - |
$117 | 16,388 | $803 | 48 | - | - | - | - | - | - |
$117 16,388 kWh |
$803 48 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $909 Cost: $1,000 |
$830 | 16,934 | $79 | 60 | - | - | - | - | - | - |
$830 16,934 kWh |
$79 60 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $480 Cost: $81 |
$480 | 9,792 | - | - | - | - | - | - | - | - |
$480 9,792 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $281,179 Cost: $175,002 |
$33,727 | 705,204 | $3,977 | 1,248 | $30,895 | 2,465 | $29,600 | - | $182,980 | - | $33,727 705,204 kWh |
$3,977 1,248 kW-months/year |
$30,895 2,465 MMBtu |
$29,600 - $ |
$182,980 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $34,922 Cost: $46,256 |
$4,418 | 90,155 | $431 | 156 | - | - | $29,600 | - | $473 | - | $4,418 90,155 kWh |
$431 156 kW-months/year |
- - MMBtu |
$29,600 - $ |
$473 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes |