IAC Assessment: UD0752
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0752
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2006
Principal Product Directional Drills and Boring Machines
NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 100,000
Annual Production 170 Pieces
Production Hrs. Annual 6,600
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $156,359 1,803,228 kWh $0.09
Natural Gas $125,832 10,459 MMBtu $12.03
TOTAL ENERGY COSTS $282,191
RECOMMENDED SAVINGS* $33,962 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,962
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,473
Cost:
$40,463
$5,148 257,400 $10,787 39 $2,538 - $5,148
257,400
kWh
$10,787
39
kW-months/year
$2,538
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$7,542
Cost:
-
- - - - $7,542 - -
-
kWh
-
-
kW-months/year
$7,542
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,798
Cost:
$225
$1,227 61,380 $2,571 9 - - $1,227
61,380
kWh
$2,571
9
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,557
Cost:
-
$1,727 86,350 $830 3 - - $1,727
86,350
kWh
$830
3
kW-months/year
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,592
Cost:
-
$375 18,755 $1,217 4 - - $375
18,755
kWh
$1,217
4
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$33,962
Cost:
$40,688
$8,477 423,885 $15,405 55 $10,080 - $8,477
423,885
kWh
$15,405
55
kW-months/year
$10,080
-
$
TOTAL IMPLEMENTED Savings:
$33,962
Cost:
$40,688
$8,477 423,885 $15,405 55 $10,080 - $8,477
423,885
kWh
$15,405
55
kW-months/year
$10,080
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes