IAC Assessment: UD0762
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0762
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2007
Principal Product Abrasives
NAICS 327910 - Abrasive Product Manufacturing
SIC 3291 - Abrasive Products
Sales $10,000,000-$50,000,000
# of Employees 174
Plant Area (Sq.Ft.) 259,000
Annual Production 40,000,000 Pieces
Production Hrs. Annual 2,040
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $103,448 2,719,360 kWh $0.04
Electricity Demand $118,133 8,508 kW-months/year $13.88
Natural Gas $286,000 25,978 MMBtu $11.01
TOTAL ENERGY COSTS $507,581
RECOMMENDED SAVINGS* $92,635 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,570
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$25,211
Cost:
-
- - - - - - - - - - $25,211 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$25,211
-
$
02: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$23,789
Cost:
$95,156
- - - - $23,789 - - - - - - - -
-
kWh
-
-
kW-months/year
$23,789
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$22,493
Cost:
$9,310
- - - - - - $22,493 2,043 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$22,493
2,043
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,650
Cost:
$33,580
$2,299 74,162 $4,040 291 - - - - $311 - - - $2,299
74,162
kWh
$4,040
291
kW-months/year
-
-
$
-
-
MMBtu
$311
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,048
Cost:
$19,730
$1,883 60,741 $3,970 286 - - - - $195 - - - $1,883
60,741
kWh
$3,970
286
kW-months/year
-
-
$
-
-
MMBtu
$195
-
$
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,706
Cost:
$7,000
$1,042 33,600 $667 12 - - $3,997 363 - - - - $1,042
33,600
kWh
$667
12
kW-months/year
-
-
$
$3,997
363
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,709
Cost:
$1,465
$1,042 33,600 $667 12 - - - - - - - - $1,042
33,600
kWh
$667
12
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
08: 2.7122 DISCONNECT BALLASTS Savings:
$1,029
Cost:
$180
$331 10,672 $698 50 - - - - - - - - $331
10,672
kWh
$698
50
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$92,635
Cost:
$166,421
$6,597 212,775 $10,042 651 $23,789 - $26,490 2,406 $506 - $25,211 - $6,597
212,775
kWh
$10,042
651
kW-months/year
$23,789
-
$
$26,490
2,406
MMBtu
$506
-
$
$25,211
-
$
TOTAL IMPLEMENTED Savings:
$33,570
Cost:
$35,045
$3,341 107,762 $4,707 303 - - - - $311 - $25,211 - $3,341
107,762
kWh
$4,707
303
kW-months/year
-
-
$
-
-
MMBtu
$311
-
$
$25,211
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes