IAC logo
IAC Assessment: UD0763
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0763
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2007
Principal Product Hamburger Patties
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $100,000,000-$500,000,000
# of Employees 48
Plant Area (Sq.Ft.) 101,935
Annual Production 250,000,000 Pounds
Production Hrs. Annual 6,084
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,751,958 34,392,364 kWh $0.05
Natural Gas $135,837 10,327 MMBtu $13.15
TOTAL ENERGY COSTS $2,119,819
RECOMMENDED SAVINGS* $93,735 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $67,129
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$36,135
Cost:
$5,242
- - - - $36,135 2,677 - - - - -
-
kWh
-
-
kW-months/year
$36,135
2,677
MMBtu
-
-
lb
-
-
$
02: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$30,994
Cost:
$8,900
$(-298) (-9,310) $922 (-8) - - $30,370 1,756,000 - - $(-298)
(-9,310)
kWh
$922
(-8)
kW-months/year
-
-
MMBtu
$30,370
1,756,000
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,945
Cost:
$57,910
$11,699 365,601 $5,900 46 - - - - $1,346 - $11,699
365,601
kWh
$5,900
46
kW-months/year
-
-
MMBtu
-
-
lb
$1,346
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,551
Cost:
$8,100
$2,596 83,256 $778 6 - - - - $177 - $2,596
83,256
kWh
$778
6
kW-months/year
-
-
MMBtu
-
-
lb
$177
-
$
05: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$2,275
Cost:
-
$1,522 45,578 $753 12 - - - - - - $1,522
45,578
kWh
$753
12
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$1,835
Cost:
$3,670
$1,228 38,384 $607 10 - - - - - - $1,228
38,384
kWh
$607
10
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$93,735
Cost:
$83,822
$16,747 523,509 $8,960 66 $36,135 2,677 $30,370 1,756,000 $1,523 - $16,747
523,509
kWh
$8,960
66
kW-months/year
$36,135
2,677
MMBtu
$30,370
1,756,000
lb
$1,523
-
$
TOTAL IMPLEMENTED Savings:
$67,129
Cost:
$14,142
$(-298) (-9,310) $922 (-8) $36,135 2,677 $30,370 1,756,000 - - $(-298)
(-9,310)
kWh
$922
(-8)
kW-months/year
$36,135
2,677
MMBtu
$30,370
1,756,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes