IAC Assessment: UD0764
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0764
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2007
Principal Product Laminated fiberglass Truck caps and lids
NAICS 336214 - Travel Trailer and Camper Manufacturing
SIC 3792 - Travel Trailers And Campers
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 204,000
Annual Production 87,600 Pieces
Production Hrs. Annual 5,100
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $429,469 6,687,200 kWh $0.06
Natural Gas $697,454 64,614 MMBtu $10.79
TOTAL ENERGY COSTS $1,153,534
RECOMMENDED SAVINGS* $202,702 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $71,112
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$101,033
Cost:
$243,645
- - - - - - $101,033 9,363 - - -
-
kWh
-
-
kW-months/year
-
-
$
$101,033
9,363
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$35,952
Cost:
$98,336
- - - - - - $35,952 3,332 - - -
-
kWh
-
-
kW-months/year
-
-
$
$35,952
3,332
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,818
Cost:
$49,600
$7,745 276,624 $16,396 54 - - - - $677 - $7,745
276,624
kWh
$16,396
54
kW-months/year
-
-
$
-
-
MMBtu
$677
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$24,334
Cost:
$6,000
- - - - $24,334 - - - - - -
-
kWh
-
-
kW-months/year
$24,334
-
$
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,675
Cost:
$1,275
$1,652 58,650 $3,023 10 - - - - - - $1,652
58,650
kWh
$3,023
10
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7495 INSTALL REPLACEMENT DOORS Savings:
$6,223
Cost:
$13,000
- - - - - - $6,223 577 - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,223
577
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,230
Cost:
$760
$3,230 104,193 - - - - - - - - $3,230
104,193
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,437
Cost:
-
$868 28,002 $1,569 6 - - - - - - $868
28,002
kWh
$1,569
6
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$202,702
Cost:
$412,616
$13,495 467,469 $20,988 70 $24,334 - $143,208 13,272 $677 - $13,495
467,469
kWh
$20,988
70
kW-months/year
$24,334
-
$
$143,208
13,272
MMBtu
$677
-
$
TOTAL IMPLEMENTED Savings:
$71,112
Cost:
$149,971
$13,495 467,469 $20,988 70 - - $35,952 3,332 $677 - $13,495
467,469
kWh
$20,988
70
kW-months/year
-
-
$
$35,952
3,332
MMBtu
$677
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes