Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2007 |
Principal Product | Polypropylene Compounding |
NAICS | 325211 - Plastics Material and Resin Manufacturing |
SIC | 2821 - Plastics Materials And Resins |
Sales | $10,000,000-$50,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 120,000,000 Pounds |
Production Hrs. Annual | 8,568 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,161,641 | 20,956,870 | kWh | $0.06 |
Natural Gas | $30,587 | 2,395 | MMBtu | $12.77 |
TOTAL ENERGY COSTS | $1,310,995 | |||
RECOMMENDED SAVINGS* | $86,305 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $32,909 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE |
Savings: $30,284 Cost: $1,500 |
- | - | - | - | - | - | $30,284 | 2,441,050 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$30,284 2,441,050 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $20,419 Cost: $17,235 |
$13,195 | 399,840 | $7,224 | 47 | - | - | - | - | - | - |
$13,195 399,840 kWh |
$7,224 47 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $14,876 Cost: - |
$9,613 | 291,312 | $5,263 | 34 | - | - | - | - | - | - |
$9,613 291,312 kWh |
$5,263 34 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,731 Cost: $33,190 |
$5,259 | 159,365 | $2,468 | 16 | $2,004 | 157 | - | - | - | - |
$5,259 159,365 kWh |
$2,468 16 kW-months/year |
$2,004 157 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,309 Cost: $7,740 |
$2,275 | 68,928 | $840 | 5 | - | - | - | - | $194 | - |
$2,275 68,928 kWh |
$840 5 kW-months/year |
- - MMBtu |
- - Tgal |
$194 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION |
Savings: $2,922 Cost: $5,000 |
$2,922 | 88,560 | - | - | - | - | - | - | - | - |
$2,922 88,560 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,625 Cost: $2,175 |
$1,696 | 51,408 | $929 | 6 | - | - | - | - | - | - |
$1,696 51,408 kWh |
$929 6 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,139 Cost: $5,050 |
$1,278 | 38,727 | $700 | 5 | - | - | - | - | $161 | - |
$1,278 38,727 kWh |
$700 5 kW-months/year |
- - MMBtu |
- - Tgal |
$161 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $86,305 Cost: $71,890 |
$36,238 | 1,098,140 | $17,424 | 113 | $2,004 | 157 | $30,284 | 2,441,050 | $355 | - | $36,238 1,098,140 kWh |
$17,424 113 kW-months/year |
$2,004 157 MMBtu |
$30,284 2,441,050 Tgal |
$355 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $32,909 Cost: $3,675 |
$1,696 | 51,408 | $929 | 6 | - | - | $30,284 | 2,441,050 | - | - | $1,696 51,408 kWh |
$929 6 kW-months/year |
- - MMBtu |
$30,284 2,441,050 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes |