Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2007 |
Principal Product | Various Composite Products |
NAICS | 339999 - All Other Miscellaneous Manufacturing |
SIC | 3999 - Manufacturing Industries, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 108 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 7,000 Pieces |
Production Hrs. Annual | 3,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $319,500 | 3,820,973 | kWh | $0.08 |
Natural Gas | $86,105 | 7,126 | MMBtu | $12.08 |
TOTAL ENERGY COSTS | $819,846 | |||
RECOMMENDED SAVINGS* | $65,353 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,040 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $19,680 Cost: $80,800 |
$6,509 | 216,960 | $12,267 | 72 | - | - | $904 | - | - | - |
$6,509 216,960 kWh |
$12,267 72 kW-months/year |
- - MMBtu |
$904 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $11,440 Cost: $46,362 |
$11,440 | 381,327 | - | - | - | - | - | - | - | - |
$11,440 381,327 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $10,780 Cost: $20,512 |
$450 | 14,984 | - | - | $10,330 | 855 | - | - | - | - |
$450 14,984 kWh |
- - kW-months/year |
$10,330 855 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $8,081 Cost: $4,600 |
$1,656 | 55,200 | $6,425 | 37 | - | - | - | - | - | - |
$1,656 55,200 kWh |
$6,425 37 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1224 REPLACE BOILER |
Savings: $5,791 Cost: $40,000 |
- | - | - | - | $5,791 | 489 | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,791 489 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $5,131 Cost: $1,000 |
- | - | - | - | - | - | - | - | $5,131 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$5,131 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $2,180 Cost: - |
$2,180 | 72,677 | - | - | - | - | - | - | - | - |
$2,180 72,677 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,410 Cost: $400 |
$565 | 18,833 | - | - | $845 | 70 | - | - | - | - |
$565 18,833 kWh |
- - kW-months/year |
$845 70 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $860 Cost: - |
- | - | - | - | $860 | 72 | - | - | - | - |
- - kWh |
- - kW-months/year |
$860 72 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $65,353 Cost: $193,674 |
$22,800 | 759,981 | $18,692 | 109 | $17,826 | 1,486 | $904 | - | $5,131 | - | $22,800 759,981 kWh |
$18,692 109 kW-months/year |
$17,826 1,486 MMBtu |
$904 - $ |
$5,131 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,040 Cost: - |
$2,180 | 72,677 | - | - | $860 | 72 | - | - | - | - | $2,180 72,677 kWh |
- - kW-months/year |
$860 72 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption |