Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2008 |
Principal Product | Aluminum Recycling |
NAICS | 331314 - Secondary Smelting and Alloying of Aluminum |
SIC | 3341 - Secondary Nonferrous Metals |
Sales | $100,000,000-$500,000,000 |
# of Employees | 210 |
Plant Area (Sq.Ft.) | 326,000 |
Annual Production | 340,000,000 Pounds |
Production Hrs. Annual | 8,736 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,396,584 | 22,674,843 | kWh | $0.06 |
TOTAL ENERGY COSTS | $1,396,584 | |||
RECOMMENDED SAVINGS* | $360,011 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $203,704 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $118,235 Cost: $50,000 |
$24,723 | 398,764 | - | - | $93,512 | 11,689 | - | - |
$24,723 398,764 kWh |
- - kW-months/year |
$93,512 11,689 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $94,656 Cost: $6,000 |
- | - | - | - | $94,656 | 11,832 | - | - |
- - kWh |
- - kW-months/year |
$94,656 11,832 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $83,440 Cost: $5,000 |
- | - | - | - | $83,440 | 10,430 | - | - |
- - kWh |
- - kW-months/year |
$83,440 10,430 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $15,764 Cost: $4,008 |
$11,808 | 240,990 | $3,956 | 28 | - | - | - | - |
$11,808 240,990 kWh |
$3,956 28 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,705 Cost: $3,275 |
$7,277 | 148,512 | $2,428 | 17 | - | - | - | - |
$7,277 148,512 kWh |
$2,428 17 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $9,454 Cost: - |
$7,089 | 144,668 | $2,365 | 17 | - | - | - | - |
$7,089 144,668 kWh |
$2,365 17 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,208 Cost: $12,758 |
$6,489 | 132,420 | $2,165 | 15 | - | - | $554 | - |
$6,489 132,420 kWh |
$2,165 15 kW-months/year |
- - MMBtu |
$554 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $8,237 Cost: - |
$6,181 | 126,144 | $2,056 | 14 | - | - | - | - |
$6,181 126,144 kWh |
$2,056 14 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,863 Cost: $6,540 |
$3,764 | 96,445 | $775 | 5 | - | - | $324 | - |
$3,764 96,445 kWh |
$775 5 kW-months/year |
- - MMBtu |
$324 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,371 Cost: $2,250 |
$3,371 | 68,796 | - | - | - | - | - | - |
$3,371 68,796 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE |
Savings: $3,078 Cost: - |
$3,078 | 62,810 | - | - | - | - | - | - |
$3,078 62,810 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $360,011 Cost: $89,831 |
$73,780 | 1,419,549 | $13,745 | 96 | $271,608 | 33,951 | $878 | - | $73,780 1,419,549 kWh |
$13,745 96 kW-months/year |
$271,608 33,951 MMBtu |
$878 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $203,704 Cost: $16,525 |
$20,815 | 424,786 | $4,793 | 34 | $178,096 | 22,262 | - | - | $20,815 424,786 kWh |
$4,793 34 kW-months/year |
$178,096 22,262 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |