IAC logo
IAC Assessment: UD0786
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0786
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2008
Principal Product Hinges
NAICS 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 180,000
Annual Production 8,500,000 Pieces
Production Hrs. Annual 4,250
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,108 1,041,600 kWh $0.10
Natural Gas $99,778 7,360 MMBtu $13.56
TOTAL ENERGY COSTS $205,886
RECOMMENDED SAVINGS* $71,784 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $67,957
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$33,340
Cost:
$66,680
- - - - $33,340 2,766 - - -
-
kWh
-
-
kW-months/year
$33,340
2,766
MMBtu
-
-
$
02: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$16,751
Cost:
$15,000
- - - - $16,751 2,239 - - -
-
kWh
-
-
kW-months/year
$16,751
2,239
MMBtu
-
-
$
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$8,467
Cost:
$5,000
- - - - $8,467 626 - - -
-
kWh
-
-
kW-months/year
$8,467
626
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,109
Cost:
$9,240
$938 30,260 $1,757 7 - - $414 - $938
30,260
kWh
$1,757
7
kW-months/year
-
-
MMBtu
$414
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,446
Cost:
-
$818 26,400 $1,628 7 - - - - $818
26,400
kWh
$1,628
7
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,387
Cost:
$1,280
$2,387 77,000 - - - - - - $2,387
77,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,608
Cost:
$5,812
$811 29,142 $797 4 - - - - $811
29,142
kWh
$797
4
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7495 INSTALL REPLACEMENT DOORS Savings:
$1,292
Cost:
$7,600
- - - - $1,292 96 - - -
-
kWh
-
-
kW-months/year
$1,292
96
MMBtu
-
-
$
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,154
Cost:
-
$1,154 37,300 - - - - - - $1,154
37,300
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$927
Cost:
$140
$310 10,000 $617 3 - - - - $310
10,000
kWh
$617
3
kW-months/year
-
-
MMBtu
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$303
Cost:
$1,000
$198 6,400 $105 2 - - - - $198
6,400
kWh
$105
2
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$71,784
Cost:
$111,752
$6,616 216,502 $4,904 23 $59,850 5,727 $414 - $6,616
216,502
kWh
$4,904
23
kW-months/year
$59,850
5,727
MMBtu
$414
-
$
TOTAL IMPLEMENTED Savings:
$67,957
Cost:
$98,200
$5,495 177,360 $3,490 16 $58,558 5,631 $414 - $5,495
177,360
kWh
$3,490
16
kW-months/year
$58,558
5,631
MMBtu
$414
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes