IAC Assessment: UD0789
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0789
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2009
Principal Product Horticulture Containers
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 270
Plant Area (Sq.Ft.) 310,000
Annual Production 700,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,842,148 31,483,292 kWh $0.06
Natural Gas $153,875 14,252 MMBtu $10.80
TOTAL ENERGY COSTS $1,996,023
RECOMMENDED SAVINGS* $184,523 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $86,175
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ $ $ $ $ $ $ $
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$35,682
Cost:
$25,000
$35,682 584,963 - - - - - - - - $35,682
584,963
kWh
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$33,134
Cost:
-
$33,134 543,180 - - - - - - - - $33,134
543,180
kWh
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$32,063
Cost:
$3,630
$32,063 538,740 - - - - - - - - $32,063
538,740
kWh
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,092
Cost:
$46,620
$28,233 315,000 - - - - $1,859 - - - $28,233
315,000
kWh
-
-
$
-
-
$
$1,859
-
$
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$16,900
Cost:
$500
$16,900 277,056 - - - - - - - - $16,900
277,056
kWh
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,888
Cost:
$26,100
$12,888 211,277 - - - - - - - - $12,888
211,277
kWh
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,305
Cost:
$92,000
- - $12,305 - - - - - - - -
-
kWh
$12,305
-
$
-
-
$
-
-
$
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,410
Cost:
$20,400
$5,410 88,704 - - - - - - - - $5,410
88,704
kWh
-
-
$
-
-
$
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,439
Cost:
$8,250
$3,634 59,658 - - - - - - $(-195) - $3,634
59,658
kWh
-
-
$
-
-
$
-
-
$
$(-195)
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,610
Cost:
$1,000
$6,610 108,370 - - $(-3,600) - - - $(-400) - $6,610
108,370
kWh
-
-
$
$(-3,600)
-
$
-
-
$
$(-400)
-
$
TOTAL RECOMMENDED Savings:
$184,523
Cost:
$223,500
$174,554 2,726,948 $12,305 - $(-3,600) - $1,859 - $(-595) - $174,554
2,726,948
kWh
$12,305
-
$
$(-3,600)
-
$
$1,859
-
$
$(-595)
-
$
TOTAL IMPLEMENTED Savings:
$86,175
Cost:
$56,370
$88,511 1,303,264 - - $(-3,600) - $1,859 - $(-595) - $88,511
1,303,264
kWh
-
-
$
$(-3,600)
-
$
$1,859
-
$
$(-595)
-
$
Savings
Cost
$ kWh $ $ $ $ $ $ $ $
Electricity Usage Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost