Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2009 |
Principal Product | Sheet Metal Fabrication and Machined Parts |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | <$500,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 3,750 Pieces |
Production Hrs. Annual | 2,250 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $103,166 | 983,640 | kWh | $0.10 |
Natural Gas | $70,531 | 6,330 | MMBtu | $11.14 |
TOTAL ENERGY COSTS | $173,697 | |||
RECOMMENDED SAVINGS* | $39,575 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,877 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $13,072 Cost: $16,185 |
$1,391 | 14,195 | - | - | $11,681 | 959 |
$1,391 14,195 kWh |
- - kW-months/year |
$11,681 959 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,384 Cost: $29,087 |
$6,726 | 64,916 | $1,658 | 29 | - | - |
$6,726 64,916 kWh |
$1,658 29 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $7,645 Cost: - |
$3,900 | 39,800 | - | - | $3,745 | 309 |
$3,900 39,800 kWh |
- - kW-months/year |
$3,745 309 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $3,637 Cost: $1,000 |
- | - | - | - | $3,637 | 392 |
- - kWh |
- - kW-months/year |
$3,637 392 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $1,711 Cost: $6,468 |
$1,711 | 17,463 | - | - | - | - |
$1,711 17,463 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,230 Cost: $1,500 |
- | - | - | - | $1,230 | 101 |
- - kWh |
- - kW-months/year |
$1,230 101 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $1,084 Cost: $2,812 |
- | - | - | - | $1,084 | 89 |
- - kWh |
- - kW-months/year |
$1,084 89 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $797 Cost: $1,907 |
$621 | 6,338 | $176 | 3 | - | - |
$621 6,338 kWh |
$176 3 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $487 Cost: $2,374 |
$372 | 3,794 | $115 | 2 | - | - |
$372 3,794 kWh |
$115 2 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,334 Cost: $1,000 |
$1,058 | 10,800 | $276 | 5 | - | - |
$1,058 10,800 kWh |
$276 5 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $194 Cost: - |
$154 | 1,575 | $40 | 1 | - | - |
$154 1,575 kWh |
$40 1 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $39,575 Cost: $62,333 |
$15,933 | 158,881 | $2,265 | 40 | $21,377 | 1,850 | $15,933 158,881 kWh |
$2,265 40 kW-months/year |
$21,377 1,850 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,877 Cost: $35,868 |
$12,677 | 125,648 | $2,225 | 39 | $4,975 | 410 | $12,677 125,648 kWh |
$2,225 39 kW-months/year |
$4,975 410 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |