IAC Assessment: UD0803
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0803
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2009
Principal Product Pharmaceuticals
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 106,000
Annual Production 2,828,958 Pounds
Production Hrs. Annual 6,600
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $333,397 10,118,000 kWh $0.03
Electricity Demand $289,298 18,040 kW-months/year $16.04
Natural Gas $601,696 63,988 MMBtu $9.40
TOTAL ENERGY COSTS $1,248,877
RECOMMENDED SAVINGS* $501,437 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $419,807
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ Tgal
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$393,528
Cost:
$8,000
$58,968 1,902,197 - - - - $334,560 37,975 - - - - $58,968
1,902,197
kWh
-
-
kW-months/year
-
-
$
$334,560
37,975
MMBtu
-
-
$
-
-
Tgal
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$21,371
Cost:
$3,376
- - - - - - $21,371 2,426 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$21,371
2,426
MMBtu
-
-
$
-
-
Tgal
03: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$17,615
Cost:
$84,000
$(-2,154) (-76,534) $(-1,754) 9 - - $21,523 2,443 - - - - $(-2,154)
(-76,534)
kWh
$(-1,754)
9
kW-months/year
-
-
$
$21,523
2,443
MMBtu
-
-
$
-
-
Tgal
04: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$14,916
Cost:
$25,000
- - - - $14,916 - - - - - - - -
-
kWh
-
-
kW-months/year
$14,916
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$12,360
Cost:
$19,600
- - - - - - $12,360 1,403 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$12,360
1,403
MMBtu
-
-
$
-
-
Tgal
06: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$9,743
Cost:
$4,500
- - - - - - $9,381 1,064 - - $362 - -
-
kWh
-
-
kW-months/year
-
-
$
$9,381
1,064
MMBtu
-
-
$
$362
-
Tgal
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$8,851
Cost:
$500
- - - - - - $8,851 1,005 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,851
1,005
MMBtu
-
-
$
-
-
Tgal
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$5,627
Cost:
-
$1,574 50,780 - - - - $4,053 460 - - - - $1,574
50,780
kWh
-
-
kW-months/year
-
-
$
$4,053
460
MMBtu
-
-
$
-
-
Tgal
09: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$4,480
Cost:
$1,000
- - - - - - $4,480 508 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,480
508
MMBtu
-
-
$
-
-
Tgal
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,845
Cost:
$4,930
$2,308 74,451 $1,553 9 - - - - $(-16) - - - $2,308
74,451
kWh
$1,553
9
kW-months/year
-
-
$
-
-
MMBtu
$(-16)
-
$
-
-
Tgal
11: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,432
Cost:
-
$3,432 57,210 - - - - - - - - - - $3,432
57,210
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
12: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,959
Cost:
$1,300
$1,009 32,552 $950 5 - - - - - - - - $1,009
32,552
kWh
$950
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,499
Cost:
$1,479
$882 28,445 $593 3 - - - - $24 - - - $882
28,445
kWh
$593
3
kW-months/year
-
-
$
-
-
MMBtu
$24
-
$
-
-
Tgal
14: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$1,120
Cost:
-
- - - - - - $1,120 127 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,120
127
MMBtu
-
-
$
-
-
Tgal
15: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$663
Cost:
$1,125
$396 12,790 $267 1 - - - - - - - - $396
12,790
kWh
$267
1
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
16: 2.7122 DISCONNECT BALLASTS Savings:
$428
Cost:
-
$253 8,147 $175 1 - - - - - - - - $253
8,147
kWh
$175
1
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$501,437
Cost:
$154,810
$66,668 2,090,038 $1,784 28 $14,916 - $417,699 47,411 $8 - $362 - $66,668
2,090,038
kWh
$1,784
28
kW-months/year
$14,916
-
$
$417,699
47,411
MMBtu
$8
-
$
$362
-
Tgal
TOTAL IMPLEMENTED Savings:
$419,807
Cost:
$12,376
$59,221 1,910,344 $175 1 - - $360,411 40,909 - - - - $59,221
1,910,344
kWh
$175
1
kW-months/year
-
-
$
$360,411
40,909
MMBtu
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Water Consumption