Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2009 |
Principal Product | Parchment and converting paper |
NAICS | 322211 - Corrugated and Solid Fiber Box Manufacturing |
SIC | 2679 - Converted Paper Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 160 |
Plant Area (Sq.Ft.) | 181,808 |
Annual Production | 10,000 Tons |
Production Hrs. Annual | 7,200 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $320,406 | 4,981,880 | kWh | $0.06 |
Natural Gas | $1,204,727 | 102,506 | MMBtu | $11.75 |
TOTAL ENERGY COSTS | $1,537,175 | |||
RECOMMENDED SAVINGS* | $224,063 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $129,160 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $49,362 Cost: $48,000 |
- | - | - | - | $49,362 | 4,380 | - | - | - | - |
- - kWh |
- - kW-months/year |
$49,362 4,380 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2524 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED |
Savings: $38,869 Cost: $12,000 |
- | - | - | - | $38,869 | 3,449 | - | - | - | - |
- - kWh |
- - kW-months/year |
$38,869 3,449 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE |
Savings: $35,001 Cost: $9,000 |
$741 | 22,464 | - | - | $34,260 | 3,040 | - | - | - | - |
$741 22,464 kWh |
- - kW-months/year |
$34,260 3,040 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $23,089 Cost: $4,000 |
- | - | - | - | $23,089 | 2,049 | - | - | - | - |
- - kWh |
- - kW-months/year |
$23,089 2,049 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $17,277 Cost: $500 |
- | - | - | - | $17,277 | 1,533 | - | - | - | - |
- - kWh |
- - kW-months/year |
$17,277 1,533 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $10,661 Cost: $6,000 |
- | - | - | - | $10,661 | 946 | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,661 946 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,414 Cost: $30,134 |
$5,217 | 158,095 | $4,024 | 22 | - | - | - | - | $1,173 | - |
$5,217 158,095 kWh |
$4,024 22 kW-months/year |
- - MMBtu |
- - Tgal |
$1,173 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1232 KEEP BOILER TUBES CLEAN |
Savings: $8,490 Cost: $600 |
- | - | - | - | $8,490 | 754 | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,490 754 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,589 Cost: $5,523 |
$4,296 | 130,179 | $3,313 | 18 | - | - | - | - | $(-20) | - |
$4,296 130,179 kWh |
$3,313 18 kW-months/year |
- - MMBtu |
- - Tgal |
$(-20) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $6,963 Cost: $2,000 |
- | - | - | - | $6,963 | 618 | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,963 618 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $5,128 Cost: - |
- | - | - | - | $5,128 | 455 | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,128 455 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,004 Cost: $12,597 |
$1,706 | 51,702 | $1,316 | 7 | - | - | - | - | $982 | - |
$1,706 51,702 kWh |
$1,316 7 kW-months/year |
- - MMBtu |
- - Tgal |
$982 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $2,560 Cost: - |
$2,560 | 82,152 | - | - | - | - | - | - | - | - |
$2,560 82,152 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $1,920 Cost: $1,000 |
$1,920 | 58,188 | - | - | - | - | - | - | - | - |
$1,920 58,188 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.2522 ISOLATE HOT OR COLD EQUIPMENT |
Savings: $1,306 Cost: - |
$1,306 | 123 | - | - | - | - | - | - | - | - |
$1,306 123 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,160 Cost: $2,094 |
$589 | 17,856 | $455 | 3 | - | - | - | - | $116 | - |
$589 17,856 kWh |
$455 3 kW-months/year |
- - MMBtu |
- - Tgal |
$116 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $270 Cost: $500 |
- | - | - | - | - | - | $270 | 160 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$270 160 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $224,063 Cost: $133,948 |
$18,335 | 520,759 | $9,108 | 50 | $194,099 | 17,224 | $270 | 160 | $2,251 | - | $18,335 520,759 kWh |
$9,108 50 kW-months/year |
$194,099 17,224 MMBtu |
$270 160 Tgal |
$2,251 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $129,160 Cost: $26,100 |
$2,047 | 22,587 | - | - | $127,113 | 11,280 | - | - | - | - | $2,047 22,587 kWh |
- - kW-months/year |
$127,113 11,280 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes |