IAC Assessment: UD0812
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0812
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2010
Principal Product Electric Disconnect Equipment
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 500,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 4,000
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $803,882 21,780,000 kWh $0.04
Electricity Demand $333,188 3,847 kW-months/year $86.61
Natural Gas $979,132 77,711 MMBtu $12.60
TOTAL ENERGY COSTS $2,298,514
RECOMMENDED SAVINGS* $104,926 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,236
Cost:
$19,740
$7,659 178,110 $2,992 30 - - $585 - - - $7,659
178,110
kWh
$2,992
30
kW-months/year
-
-
MMBtu
$585
-
$
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,893
Cost:
$6,240
$2,288 53,200 $605 6 - - - - - - $2,288
53,200
kWh
$605
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,148
Cost:
-
$1,148 28,000 - - - - - - - - $1,148
28,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,589
Cost:
$1,000
$4,787 111,333 $2,802 28 - - - - - - $4,787
111,333
kWh
$2,802
28
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
05: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$2,047
Cost:
$12,500
$2,047 47,600 - - - - - - - - $2,047
47,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$14,040
Cost:
$16,000
- - - - $14,040 1,404 - - - - -
-
kWh
-
-
kW-months/year
$14,040
1,404
MMBtu
-
-
$
-
-
Tgal
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,750
Cost:
$21,000
- - - - $9,750 975 - - - - -
-
kWh
-
-
kW-months/year
$9,750
975
MMBtu
-
-
$
-
-
Tgal
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,335
Cost:
$2,310
$231 5,376 $94 3 $2,010 201 - - - - $231
5,376
kWh
$94
3
kW-months/year
$2,010
201
MMBtu
-
-
$
-
-
Tgal
09: 2.2514 COVER OPEN TANKS Savings:
$4,280
Cost:
$3,600
- - - - $4,280 428 - - - - -
-
kWh
-
-
kW-months/year
$4,280
428
MMBtu
-
-
$
-
-
Tgal
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,963
Cost:
$5,000
- - - - $1,963 1,963 - - - - -
-
kWh
-
-
kW-months/year
$1,963
1,963
MMBtu
-
-
$
-
-
Tgal
11: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$800
Cost:
$2,500
- - - - $800 80 - - - - -
-
kWh
-
-
kW-months/year
$800
80
MMBtu
-
-
$
-
-
Tgal
12: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$20,826
Cost:
$200
- - - - - - - - $20,826 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$20,826
-
Tgal
13: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,114
Cost:
$70,000
$806 100,183 $4,308 16 - - - - - - $806
100,183
kWh
$4,308
16
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
14: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,930
Cost:
$10,000
$3,569 83,006 $1,361 27 - - - - - - $3,569
83,006
kWh
$1,361
27
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
15: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$15,975
Cost:
$8,500
- - - - $15,975 1,597 - - - - -
-
kWh
-
-
kW-months/year
$15,975
1,597
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$104,926
Cost:
$178,590
$22,535 606,808 $12,162 110 $48,818 6,648 $585 - $20,826 - $22,535
606,808
kWh
$12,162
110
kW-months/year
$48,818
6,648
MMBtu
$585
-
$
$20,826
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Water Consumption