IAC Assessment: UD0828
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0828
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2010
Principal Product advertisments
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2711 - Newspapers
Sales $100,000,000-$500,000,000
# of Employees 212
Plant Area (Sq.Ft.) 144,000
Annual Production 8,740,000 Pieces
Production Hrs. Annual 8,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,283,907 17,807,909 kWh $0.07
Natural Gas $538,551 91,122 MMBtu $5.91
TOTAL ENERGY COSTS $1,822,458
RECOMMENDED SAVINGS* $281,951 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,590
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,599
Cost:
$2,599
- - - - $2,599 - - - - - -
-
kWh
-
-
kW-months/year
$2,599
-
$
-
-
MMBtu
-
-
$
02: 2.7122 DISCONNECT BALLASTS Savings:
$4,524
Cost:
$550
$3,168 69,028 $1,356 8 - - - - - - $3,168
69,028
kWh
$1,356
8
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,693
Cost:
$2,405
$1,886 41,084 $807 5 - - - - - - $1,886
41,084
kWh
$807
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE Savings:
$86,333
Cost:
$28,000
$41,340 980,244 - - - - $44,993 6,995 - - $41,340
980,244
kWh
-
-
kW-months/year
-
-
$
$44,993
6,995
MMBtu
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$28,346
Cost:
$12,800
$28,346 617,554 - - - - - - - - $28,346
617,554
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$17,796
Cost:
$62,106
$17,796 247,178 - - - - - - - - $17,796
247,178
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,431
Cost:
$1,200
$4,248 92,564 $2,183 13 - - - - - - $4,248
92,564
kWh
$2,183
13
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,272
Cost:
$14,000
$4,272 93,075 - - - - - - - - $4,272
93,075
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$6,407
Cost:
$2,100
$6,407 139,599 - - - - - - - - $6,407
139,599
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,710
Cost:
$500
$1,688 36,792 $722 4 - - - - $300 - $1,688
36,792
kWh
$722
4
kW-months/year
-
-
$
-
-
MMBtu
$300
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,598
Cost:
$500
$9,523 207,467 $4,075 24 - - - - - - $9,523
207,467
kWh
$4,075
24
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,066
Cost:
$5,000
$4,248 92,551 $1,818 11 - - - - - - $4,248
92,551
kWh
$1,818
11
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
13: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$16,653
Cost:
$25
$12,275 267,429 $4,378 15 - - - - - - $12,275
267,429
kWh
$4,378
15
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
14: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$11,308
Cost:
$25
$7,919 172,535 $3,389 20 - - - - - - $7,919
172,535
kWh
$3,389
20
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
15: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$990
Cost:
$250
$990 21,568 - - - - - - - - $990
21,568
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
16: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$52,035
Cost:
$62,500
$(-6,567) (-143,080) $(-4,818) (-28) - - $63,420 10,731 - - $(-6,567)
(-143,080)
kWh
$(-4,818)
(-28)
kW-months/year
-
-
$
$63,420
10,731
MMBtu
-
-
$
17: 2.7235 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT Savings:
$15,589
Cost:
$35,000
- - - - - - $15,589 2,638 - - -
-
kWh
-
-
kW-months/year
-
-
$
$15,589
2,638
MMBtu
-
-
$
18: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,601
Cost:
$25
- - - - - - $3,601 609 - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,601
609
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$281,951
Cost:
$229,585
$137,539 2,935,588 $13,910 72 $2,599 - $127,603 20,973 $300 - $137,539
2,935,588
kWh
$13,910
72
kW-months/year
$2,599
-
$
$127,603
20,973
MMBtu
$300
-
$
TOTAL IMPLEMENTED Savings:
$43,590
Cost:
$63,831
$36,007 643,963 $7,283 32 - - - - $300 - $36,007
643,963
kWh
$7,283
32
kW-months/year
-
-
$
-
-
MMBtu
$300
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes