IAC Assessment: UD0831
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0831
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2011
Principal Product Custom steel fabrication and boiler manufacturer
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 74,000
Annual Production 350,395 Pounds
Production Hrs. Annual 2,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,143 354,293 kWh $0.12
Electricity Demand $7,023 166 kW-months/year $42.31
LPG $13,572 723 MMBtu $18.77
Wood $186 22 MMBtu $8.32
Other Gas $61,657 3,285 MMBtu $18.77
TOTAL ENERGY COSTS $125,581
RECOMMENDED SAVINGS* $43,698 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,431
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Wood Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$28,448
Cost:
$196,170
$6,285 57,850 - - - - - - $22,163 - $6,285
57,850
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$22,163
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$7,067
Cost:
$25,796
$7,067 64,837 - - - - - - - - $7,067
64,837
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$4,392
Cost:
$3,863
$3,638 33,372 $754 156 - - - - - - $3,638
33,372
kWh
$754
156
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$713
Cost:
$10,495
$541 4,962 $112 24 - - $60 - - - $541
4,962
kWh
$112
24
kW-months/year
-
-
MMBtu
$60
-
$
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,848
Cost:
$12,100
$1,848 16,950 - - - - - - - - $1,848
16,950
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$904
Cost:
$1,167
$749 16,950 $155 36 - - - - - - $749
16,950
kWh
$155
36
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$189
Cost:
$240
$189 1,735 - - - - - - - - $189
1,735
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$137
Cost:
$25
- - - - $162 20 $(-25) - - - -
-
kWh
-
-
kW-months/year
$162
20
MMBtu
$(-25)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$43,698
Cost:
$249,856
$20,317 196,656 $1,021 216 $162 20 $35 - $22,163 - $20,317
196,656
kWh
$1,021
216
kW-months/year
$162
20
MMBtu
$35
-
$
$22,163
-
$
TOTAL IMPLEMENTED Savings:
$5,431
Cost:
$14,623
$4,368 40,069 $866 180 $162 20 $35 - - - $4,368
40,069
kWh
$866
180
kW-months/year
$162
20
MMBtu
$35
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Wood Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Wood Personnel Changes One-time Revenue or Avoided Cost