Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2011 |
Principal Product | Fluid Milk, Beverage, and Culture |
NAICS | 311511 - Fluid Milk Manufacturing |
SIC | 2026 - Fluid Milk |
Sales | $100,000,000-$500,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 225,000 |
Annual Production | 484,547,724 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $518,082 | 13,978,805 | kWh | $0.04 |
Electricity Demand | $331,232 | 2,248 | kW-months/year | $147.35 |
Natural Gas | $580,330 | 69,572 | MMBtu | $8.34 |
TOTAL ENERGY COSTS | $1,744,045 | |||
RECOMMENDED SAVINGS* | $137,304 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,705 Cost: $2,196 |
$903 | 22,700 | $392 | 2 | - | - | - | - | $410 | - | - | - |
$903 22,700 kWh |
$392 2 kW-months/year |
- - MMBtu |
- - Tgal |
$410 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,796 Cost: $36 |
$1,094 | 27,478 | $702 | 4 | - | - | - | - | - | - | - | - |
$1,094 27,478 kWh |
$702 4 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,689 Cost: $7,000 |
$3,168 | 79,610 | $1,521 | 9 | - | - | - | - | - | - | - | - |
$3,168 79,610 kWh |
$1,521 9 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $37,847 Cost: $32,000 |
- | - | - | - | $37,847 | 4,538 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$37,847 4,538 MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $14,178 Cost: $1,000 |
- | - | - | - | $14,178 | 1,700 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$14,178 1,700 MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,960 Cost: $1,140 |
- | - | - | - | $1,960 | 235 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,960 235 MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS |
Savings: $12,875 Cost: $15,000 |
- | - | - | - | - | - | $7,357 | 3,754 | - | - | $5,518 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$7,357 3,754 Tgal |
- - $ |
$5,518 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $30,572 Cost: $99,100 |
$30,572 | 768,144 | - | - | - | - | - | - | - | - | - | - |
$30,572 768,144 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $25,293 Cost: $18,000 |
- | - | - | - | $25,293 | 3,033 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$25,293 3,033 MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $6,389 Cost: $10,000 |
$6,389 | 160,527 | - | - | - | - | - | - | - | - | - | - |
$6,389 160,527 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $137,304 Cost: $185,472 |
$42,126 | 1,058,459 | $2,615 | 15 | $79,278 | 9,506 | $7,357 | 3,754 | $410 | - | $5,518 | - | $42,126 1,058,459 kWh |
$2,615 15 kW-months/year |
$79,278 9,506 MMBtu |
$7,357 3,754 Tgal |
$410 - $ |
$5,518 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Water Consumption |