IAC Assessment: UD0889
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0889
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2013
Principal Product Metal Stamping products
NAICS 336370 - Motor Vehicle Metal Stamping
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 58
Plant Area (Sq.Ft.) 63,000
Annual Production 14,000,000 Pieces
Production Hrs. Annual 4,940
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,778 1,954,289 kWh $0.06
Electricity Demand $8,235 4,476 kW-months/year $1.84
Electricity Fees $28,215 - $ -
Natural Gas $17,831 1,822 MMBtu $9.79
TOTAL ENERGY COSTS $174,059
RECOMMENDED SAVINGS* $19,018 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,754
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,100
Cost:
-
$1,100 17,947 - - - - - - $1,100
17,947
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$654
Cost:
$460
$623 10,164 $31 17 - - - - $623
10,164
kWh
$31
17
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,448
Cost:
$1,000
$1,666 27,188 $82 44 - - $(-300) - $1,666
27,188
kWh
$82
44
kW-months/year
-
-
MMBtu
$(-300)
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,551
Cost:
$3,500
- - - - $3,551 363 - - -
-
kWh
-
-
kW-months/year
$3,551
363
MMBtu
-
-
$
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,355
Cost:
$2,000
- - - - $1,355 138 - - -
-
kWh
-
-
kW-months/year
$1,355
138
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,219
Cost:
$7,254
$4,737 77,285 $202 109 - - $280 - $4,737
77,285
kWh
$202
109
kW-months/year
-
-
MMBtu
$280
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,401
Cost:
$9,000
$4,066 66,344 $199 108 - - $136 - $4,066
66,344
kWh
$199
108
kW-months/year
-
-
MMBtu
$136
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,290
Cost:
$1,400
$1,254 20,465 - - - - $36 - $1,254
20,465
kWh
-
-
kW-months/year
-
-
MMBtu
$36
-
$
TOTAL RECOMMENDED Savings:
$19,018
Cost:
$24,614
$13,446 219,393 $514 278 $4,906 501 $152 - $13,446
219,393
kWh
$514
278
kW-months/year
$4,906
501
MMBtu
$152
-
$
TOTAL IMPLEMENTED Savings:
$1,754
Cost:
$460
$1,723 28,111 $31 17 - - - - $1,723
28,111
kWh
$31
17
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes