Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2014 |
Principal Product | Coatings/ Asphalt |
NAICS | 325510 - Paint and Coating Manufacturing |
SIC | 2851 - Paints And Allied Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 26 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 5,000 Thousand Gallons |
Production Hrs. Annual | 3,300 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $98,645 | 1,473,862 | kWh | $0.07 |
Electricity Demand | $44,942 | 5,148 | kW-months/year | $8.73 |
Natural Gas | $46,173 | 8,958 | MMBtu | $5.15 |
TOTAL ENERGY COSTS | $189,760 | |||
RECOMMENDED SAVINGS* | $22,992 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,143 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $156 Cost: $50 |
$126 | 1,878 | $30 | 4 | - | - | - | - |
$126 1,878 kWh |
$30 4 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $11,196 Cost: $300 |
- | - | - | - | $11,196 | 2,174 | - | - |
- - kWh |
- - kW-months/year |
$11,196 2,174 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $778 Cost: - |
- | - | - | - | $778 | 151 | - | - |
- - kWh |
- - kW-months/year |
$778 151 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2514 COVER OPEN TANKS |
Savings: $57 Cost: $200 |
- | - | - | - | $57 | 11 | - | - |
- - kWh |
- - kW-months/year |
$57 11 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS |
Savings: $8,127 Cost: $6,567 |
$4,546 | 67,916 | $1,423 | 163 | $2,158 | 419 | - | - |
$4,546 67,916 kWh |
$1,423 163 kW-months/year |
$2,158 419 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,748 Cost: $2,320 |
$1,108 | 16,554 | $482 | 55 | - | - | $158 | - |
$1,108 16,554 kWh |
$482 55 kW-months/year |
- - MMBtu |
$158 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $621 Cost: $20 |
$621 | 9,282 | - | - | - | - | - | - |
$621 9,282 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $309 Cost: - |
$517 | 7,718 | $92 | 11 | - | - | $(-300) | - |
$517 7,718 kWh |
$92 11 kW-months/year |
- - MMBtu |
$(-300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,992 Cost: $9,457 |
$6,918 | 103,348 | $2,027 | 233 | $14,189 | 2,755 | $(-142) | - | $6,918 103,348 kWh |
$2,027 233 kW-months/year |
$14,189 2,755 MMBtu |
$(-142) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,143 Cost: $270 |
$1,264 | 18,878 | $122 | 14 | $57 | 11 | $(-300) | - | $1,264 18,878 kWh |
$122 14 kW-months/year |
$57 11 MMBtu |
$(-300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |