IAC Assessment: UD0898
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0898
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2014
Principal Product Coatings/ Asphalt
NAICS 325510 - Paint and Coating Manufacturing
SIC 2851 - Paints And Allied Products
Sales $50,000,000-$100,000,000
# of Employees 26
Plant Area (Sq.Ft.) 50,000
Annual Production 5,000 Thousand Gallons
Production Hrs. Annual 3,300
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,645 1,473,862 kWh $0.07
Electricity Demand $44,942 5,148 kW-months/year $8.73
Natural Gas $46,173 8,958 MMBtu $5.15
TOTAL ENERGY COSTS $189,760
RECOMMENDED SAVINGS* $22,992 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,143
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$156
Cost:
$50
$126 1,878 $30 4 - - - - $126
1,878
kWh
$30
4
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$11,196
Cost:
$300
- - - - $11,196 2,174 - - -
-
kWh
-
-
kW-months/year
$11,196
2,174
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$778
Cost:
-
- - - - $778 151 - - -
-
kWh
-
-
kW-months/year
$778
151
MMBtu
-
-
$
04: 2.2514 COVER OPEN TANKS Savings:
$57
Cost:
$200
- - - - $57 11 - - -
-
kWh
-
-
kW-months/year
$57
11
MMBtu
-
-
$
05: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$8,127
Cost:
$6,567
$4,546 67,916 $1,423 163 $2,158 419 - - $4,546
67,916
kWh
$1,423
163
kW-months/year
$2,158
419
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,748
Cost:
$2,320
$1,108 16,554 $482 55 - - $158 - $1,108
16,554
kWh
$482
55
kW-months/year
-
-
MMBtu
$158
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$621
Cost:
$20
$621 9,282 - - - - - - $621
9,282
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$309
Cost:
-
$517 7,718 $92 11 - - $(-300) - $517
7,718
kWh
$92
11
kW-months/year
-
-
MMBtu
$(-300)
-
$
TOTAL RECOMMENDED Savings:
$22,992
Cost:
$9,457
$6,918 103,348 $2,027 233 $14,189 2,755 $(-142) - $6,918
103,348
kWh
$2,027
233
kW-months/year
$14,189
2,755
MMBtu
$(-142)
-
$
TOTAL IMPLEMENTED Savings:
$1,143
Cost:
$270
$1,264 18,878 $122 14 $57 11 $(-300) - $1,264
18,878
kWh
$122
14
kW-months/year
$57
11
MMBtu
$(-300)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes