Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2014
Principal Product Quartz Tubing and Shapes
NAICS 325199 - All Other Basic Organic Chemical Manufacturing
SIC 3297 - Nonclay Refractories
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 175,300
Annual Production 25,700,000 Units
Production Hrs. Annual 4,080
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,086,155 43,946,826 kWh $0.05
Electricity Demand $30,685 8,161 kW-months/year $3.76
Natural Gas $1,449,071 334,048 MMBtu $4.34
TOTAL ENERGY COSTS $4,337,844
RECOMMENDED SAVINGS* $472,758 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $404,309
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Administrative Changes Water Consumption Electricity Usage Natural Gas Water Disposal Administrative Changes Water Consumption
$ kWh $ MMBtu $ Tgal $ $ $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,645
Cost:
$1,000
$15,645 329,583 - - - - - - - - $15,645
329,583
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,289
Cost:
$800
$4,289 90,333 - - - - - - - - $4,289
90,333
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,149
Cost:
$190
$1,064 22,431 - - - - $85 - - - $1,064
22,431
kWh
-
-
MMBtu
-
-
Tgal
$85
-
$
-
-
Tgal
04: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$221,902
Cost:
$100,000
- - - - $131,962 7,001 - - $89,940 - -
-
kWh
-
-
MMBtu
$131,962
7,001
Tgal
-
-
$
$89,940
-
Tgal
05: 2.5123 REDUCE FLUID FLOW RATES Savings:
$151,019
Cost:
$100,000
- - $126,019 29,037 - - $25,000 - - - -
-
kWh
$126,019
29,037
MMBtu
-
-
Tgal
$25,000
-
$
-
-
Tgal
06: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$25,546
Cost:
$28,000
$25,546 538,150 - - - - - - - - $25,546
538,150
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,426
Cost:
-
$4,426 93,243 - - - - - - - - $4,426
93,243
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
08: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$3,748
Cost:
$1,000
$3,748 78,946 - - - - - - - - $3,748
78,946
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
09: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$2,267
Cost:
$8,850
$2,267 47,762 - - - - - - - - $2,267
47,762
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
10: 2.7314 REDUCE VENTILATION AIR Savings:
$31,388
Cost:
$33,025
$9,913 208,828 $21,475 4,948 - - - - - - $9,913
208,828
kWh
$21,475
4,948
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,379
Cost:
$16,055
$7,269 153,135 $4,110 947 - - - - - - $7,269
153,135
kWh
$4,110
947
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$472,758
Cost:
$288,920
$74,167 1,562,411 $151,604 34,932 $131,962 7,001 $25,085 - $89,940 - $74,167
1,562,411
kWh
$151,604
34,932
MMBtu
$131,962
7,001
Tgal
$25,085
-
$
$89,940
-
Tgal
TOTAL IMPLEMENTED Savings:
$404,309
Cost:
$233,025
$9,913 208,828 $147,494 33,985 $131,962 7,001 $25,000 - $89,940 - $9,913
208,828
kWh
$147,494
33,985
MMBtu
$131,962
7,001
Tgal
$25,000
-
$
$89,940
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Natural Gas Water Disposal Administrative Changes Water Consumption Electricity Usage Natural Gas Water Disposal Administrative Changes Water Consumption