IAC logo
IAC Assessment: UD0915
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0915
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2014
Principal Product Vinyl Extrusion
NAICS 321918 - Other Millwork (including Flooring)
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 129
Plant Area (Sq.Ft.) 173,000
Annual Production 54,000,000 Pounds
Production Hrs. Annual 7,632
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,295,307 18,967,184 kWh $0.07
Electricity Demand $158,411 37,212 kW-months/year $4.26
Natural Gas $91,582 8,698 MMBtu $10.53
TOTAL ENERGY COSTS $1,569,412
RECOMMENDED SAVINGS* $195,616 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,975
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,262
Cost:
-
$2,028 34,960 $234 55 - - - - - - $2,028
34,960
kWh
$234
55
kW-months/year
-
-
Tgal
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,184
Cost:
$1,200
$15,227 262,487 $1,757 413 - - $(-4,800) - - - $15,227
262,487
kWh
$1,757
413
kW-months/year
-
-
Tgal
$(-4,800)
-
$
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$7,714
Cost:
$1,800
$7,714 132,972 - - - - - - - - $7,714
132,972
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,815
Cost:
$100
$2,524 43,502 $291 68 - - - - - - $2,524
43,502
kWh
$291
68
kW-months/year
-
-
Tgal
-
-
$
-
-
$
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,180
Cost:
$700
- - - - $1,180 343 - - - - -
-
kWh
-
-
kW-months/year
$1,180
343
Tgal
-
-
$
-
-
$
06: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$17,210
Cost:
$23,600
$15,430 265,992 $1,780 419 - - - - - - $15,430
265,992
kWh
$1,780
419
kW-months/year
-
-
Tgal
-
-
$
-
-
$
07: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$993
Cost:
$2,575
$890 15,346 $103 24 - - - - - - $890
15,346
kWh
$103
24
kW-months/year
-
-
Tgal
-
-
$
-
-
$
08: 2.2514 COVER OPEN TANKS Savings:
$14,519
Cost:
$39,186
$13,016 224,381 $1,503 353 - - - - - - $13,016
224,381
kWh
$1,503
353
kW-months/year
-
-
Tgal
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$129,321
Cost:
$377,745
$135,887 2,342,480 $15,688 3,685 - - $(-22,254) - - - $135,887
2,342,480
kWh
$15,688
3,685
kW-months/year
-
-
Tgal
$(-22,254)
-
$
-
-
$
10: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$117
Cost:
-
$105 1,806 $12 2 - - - - - - $105
1,806
kWh
$12
2
kW-months/year
-
-
Tgal
-
-
$
-
-
$
11: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$7,301
Cost:
-
$(-32) (-557) - - - - $(-3,000) - $10,333 - $(-32)
(-557)
kWh
-
-
kW-months/year
-
-
Tgal
$(-3,000)
-
$
$10,333
-
$
TOTAL RECOMMENDED Savings:
$195,616
Cost:
$446,906
$192,789 3,323,369 $21,368 5,020 $1,180 343 $(-30,054) - $10,333 - $192,789
3,323,369
kWh
$21,368
5,020
kW-months/year
$1,180
343
Tgal
$(-30,054)
-
$
$10,333
-
$
TOTAL IMPLEMENTED Savings:
$24,975
Cost:
$3,100
$27,493 473,921 $2,282 537 - - $(-4,800) - - - $27,493
473,921
kWh
$2,282
537
kW-months/year
-
-
Tgal
$(-4,800)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Disposal Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Administrative Changes Ancillary Material Cost