IAC logo
IAC Assessment: UD0917
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0917
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2014
Principal Product Recycled Plastics
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 28
Plant Area (Sq.Ft.) 60,000
Annual Production 14,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $224,731 3,155,250 kWh $0.07
Electricity Demand $51,012 5,880 kW-months/year $8.68
Natural Gas $4,138 349 MMBtu $11.86
TOTAL ENERGY COSTS $285,649
RECOMMENDED SAVINGS* $73,664 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,340
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Water Consumption Electricity Usage Electricity Demand Water Disposal Administrative Changes Water Consumption
$ kWh $ kW-months/year $ Tgal $ $ $ Tgal
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,376
Cost:
-
$9,368 133,786 $1,008 184 - - - - - - $9,368
133,786
kWh
$1,008
184
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.5123 REDUCE FLUID FLOW RATES Savings:
$3,671
Cost:
-
- - - - $1,736 270 - - $1,935 - -
-
kWh
-
-
kW-months/year
$1,736
270
Tgal
-
-
$
$1,935
-
Tgal
03: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$3,388
Cost:
-
$(-3,203) (-45,744) $(-345) (-63) $3,280 510 - - $3,656 - $(-3,203)
(-45,744)
kWh
$(-345)
(-63)
kW-months/year
$3,280
510
Tgal
-
-
$
$3,656
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$35,576
Cost:
$13,517
$30,339 433,290 $3,265 594 - - $1,972 - - - $30,339
433,290
kWh
$3,265
594
kW-months/year
-
-
Tgal
$1,972
-
$
-
-
Tgal
05: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF Savings:
$14,607
Cost:
$30,000
$13,188 188,340 $1,419 258 - - - - - - $13,188
188,340
kWh
$1,419
258
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,046
Cost:
$6,000
$5,459 77,964 $587 107 - - - - - - $5,459
77,964
kWh
$587
107
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$73,664
Cost:
$49,517
$55,151 787,636 $5,934 1,079 $5,016 780 $1,972 - $5,591 - $55,151
787,636
kWh
$5,934
1,079
kW-months/year
$5,016
780
Tgal
$1,972
-
$
$5,591
-
Tgal
TOTAL IMPLEMENTED Savings:
$49,340
Cost:
$13,517
$36,504 521,332 $3,928 714 $3,280 510 $1,972 - $3,656 - $36,504
521,332
kWh
$3,928
714
kW-months/year
$3,280
510
Tgal
$1,972
-
$
$3,656
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Water Disposal Administrative Changes Water Consumption Electricity Usage Electricity Demand Water Disposal Administrative Changes Water Consumption