IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2015
Principal Product Medical, Dental and Animal Health Equipment
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 2599 - Furniture And Fixtures, Nec
Sales $1,000,000-$5,000,000
# of Employees 460
Plant Area (Sq.Ft.) 145,800
Annual Production 740,479 Units
Production Hrs. Annual 4,080
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $212,587 5,479,894 kWh $0.04
Electricity Demand $188,520 14,244 kW-months/year $13.24
Natural Gas $320,537 39,288 MMBtu $8.16
TOTAL ENERGY COSTS $739,194
RECOMMENDED SAVINGS* $133,592 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,140
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,757
Cost:
-
$684 22,783 $1,073 60 - - - - - - - - $684
22,783
kWh
$1,073
60
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$9,792
Cost:
-
- - - - $9,792 1,200 - - - - - - -
-
kWh
-
-
kW-months/year
$9,792
1,200
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,936
Cost:
$50
$1,056 35,140 $880 49 - - - - - - - - $1,056
35,140
kWh
$880
49
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$29,266
Cost:
$9,200
$10,557 351,437 $18,709 1,033 - - - - - - - - $10,557
351,437
kWh
$18,709
1,033
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$36,602
Cost:
$22,000
$16,859 561,204 $19,743 1,091 - - - - - - - - $16,859
561,204
kWh
$19,743
1,091
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,496
Cost:
$2,295
$(-25) (-836) $(-42) (-2) $3,563 437 - - - - - - $(-25)
(-836)
kWh
$(-42)
(-2)
kW-months/year
$3,563
437
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$11,674
Cost:
-
$11,674 388,620 - - - - - - - - - - $11,674
388,620
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,715
Cost:
-
$791 26,316 $924 52 - - - - - - - - $791
26,316
kWh
$924
52
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
09: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$4,591
Cost:
$4,300
$1,721 57,287 $2,870 158 - - - - - - - - $1,721
57,287
kWh
$2,870
158
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
10: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$2,652
Cost:
$5,000
- - - - $2,652 325 - - - - - - -
-
kWh
-
-
kW-months/year
$2,652
325
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
11: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$242
Cost:
$700
$242 8,042 - - - - - - - - - - $242
8,042
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
12: 3.1182 MAKE A NEW BY-PRODUCT Savings:
$24,789
Cost:
$46,000
$(-185) (-6,160) - - $5,914 725 - - $19,060 - - - $(-185)
(-6,160)
kWh
-
-
kW-months/year
$5,914
725
MMBtu
-
-
Tgal
$19,060
-
$
-
-
Tgal
13: 3.4133 CLEAN FOULING FROM WATER LINES REGULARLY Savings:
$5,080
Cost:
$2,750
$(-71) (-2,367) $(-126) (-7) - - $2,441 1,275 - - $2,836 - $(-71)
(-2,367)
kWh
$(-126)
(-7)
kW-months/year
-
-
MMBtu
$2,441
1,275
Tgal
-
-
$
$2,836
-
Tgal
TOTAL RECOMMENDED Savings:
$133,592
Cost:
$92,295
$43,303 1,441,466 $44,031 2,434 $21,921 2,687 $2,441 1,275 $19,060 - $2,836 - $43,303
1,441,466
kWh
$44,031
2,434
kW-months/year
$21,921
2,687
MMBtu
$2,441
1,275
Tgal
$19,060
-
$
$2,836
-
Tgal
TOTAL IMPLEMENTED Savings:
$56,140
Cost:
$9,250
$24,762 824,296 $21,586 1,194 $9,792 1,200 - - - - - - $24,762
824,296
kWh
$21,586
1,194
kW-months/year
$9,792
1,200
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption