IAC Assessment: UD0928
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0928
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2015
Principal Product Titanium Mill: Flat and Billet
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $100,000,000-$500,000,000
# of Employees 600
Plant Area (Sq.Ft.) 750,000
Annual Production 17,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,557,720 74,594,610 kWh $0.05
Electricity Demand $522,834 183,552 kW-months/year $2.85
Natural Gas $2,037,726 376,776 MMBtu $5.41
TOTAL ENERGY COSTS $6,118,280
RECOMMENDED SAVINGS* $793,900 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,389
Cost:
-
$9,740 191,123 $649 262 - - - - - - $9,740
191,123
kWh
$649
262
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$153,677
Cost:
$48,000
$165,658 3,250,749 $16,703 6,735 $(-28,684) (-5,302) - - - - $165,658
3,250,749
kWh
$16,703
6,735
kW-months/year
$(-28,684)
(-5,302)
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$314,492
Cost:
$152,750
$286,300 5,618,135 $19,086 7,696 - - $9,106 - - - $286,300
5,618,135
kWh
$19,086
7,696
kW-months/year
-
-
MMBtu
$9,106
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,735
Cost:
$12,995
$2,439 47,872 - - - - $296 - - - $2,439
47,872
kWh
-
-
kW-months/year
-
-
MMBtu
$296
-
$
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$52,184
Cost:
$105,000
- - - - $52,184 9,646 - - - - -
-
kWh
-
-
kW-months/year
$52,184
9,646
MMBtu
-
-
$
-
-
$
06: 2.2514 COVER OPEN TANKS Savings:
$2,876
Cost:
$2,196
- - - - $2,876 532 - - - - -
-
kWh
-
-
kW-months/year
$2,876
532
MMBtu
-
-
$
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$154,780
Cost:
$150,000
- - - - $154,780 28,610 - - - - -
-
kWh
-
-
kW-months/year
$154,780
28,610
MMBtu
-
-
$
-
-
$
08: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$11,986
Cost:
$18,300
$11,237 220,500 $749 302 - - - - - - $11,237
220,500
kWh
$749
302
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,264
Cost:
$30,000
- - - - $12,264 2,267 - - - - -
-
kWh
-
-
kW-months/year
$12,264
2,267
MMBtu
-
-
$
-
-
$
10: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$5,622
Cost:
$25,000
$5,271 103,444 $351 142 - - - - - - $5,271
103,444
kWh
$351
142
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,007
Cost:
$1,000
$8,257 162,021 $550 222 - - $(-4,800) - - - $8,257
162,021
kWh
$550
222
kW-months/year
-
-
MMBtu
$(-4,800)
-
$
-
-
$
12: 3.3111 ADJUST PH FOR NEUTRALIZATION Savings:
$68,888
Cost:
$34,000
$(-92) (-1,800) - - - - $(-1,200) - $70,180 - $(-92)
(-1,800)
kWh
-
-
kW-months/year
-
-
MMBtu
$(-1,200)
-
$
$70,180
-
$
TOTAL RECOMMENDED Savings:
$793,900
Cost:
$579,241
$488,810 9,592,044 $38,088 15,359 $193,420 35,753 $3,402 - $70,180 - $488,810
9,592,044
kWh
$38,088
15,359
kW-months/year
$193,420
35,753
MMBtu
$3,402
-
$
$70,180
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost