IAC Assessment: UD0934
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0934
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2015
Principal Product Surfactants for personal care
NAICS 325611 - Soap and Other Detergent Manufacturing
SIC 2843 - Surface Active Agents
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 74,000
Annual Production 220,000,000 Pounds
Production Hrs. Annual 8,568
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $334,234 5,704,800 kWh $0.06
Electricity Demand $145,445 10,224 kW-months/year $14.23
Electricity Fees $1,926 - $ -
Natural Gas $205,927 34,664 MMBtu $5.94
TOTAL ENERGY COSTS $750,214
RECOMMENDED SAVINGS* $126,886 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,336
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$51,417
Cost:
-
- - - - - - $51,417 16,025 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$51,417
16,025
Tgal
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,375
Cost:
-
- - - - $2,375 428 - - - - -
-
kWh
-
-
kW-months/year
$2,375
428
MMBtu
-
-
Tgal
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$250
Cost:
$224
- - - - $250 45 - - - - -
-
kWh
-
-
kW-months/year
$250
45
MMBtu
-
-
Tgal
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,235
Cost:
$5,300
$11,235 185,099 - - - - - - - - $11,235
185,099
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,084
Cost:
$2,000
$2,314 38,121 $770 52 - - - - - - $2,314
38,121
kWh
$770
52
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$25,672
Cost:
$18,125
$24,964 411,264 $708 48 - - - - - - $24,964
411,264
kWh
$708
48
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,363
Cost:
$2,700
$1,017 16,760 $346 24 - - - - - - $1,017
16,760
kWh
$346
24
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.7314 REDUCE VENTILATION AIR Savings:
$11,488
Cost:
$18,984
- - - - $11,488 2,070 - - - - -
-
kWh
-
-
kW-months/year
$11,488
2,070
MMBtu
-
-
Tgal
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,944
Cost:
$75,059
$14,116 232,556 $3,550 241 - - - - $1,278 - $14,116
232,556
kWh
$3,550
241
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,278
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,058
Cost:
$330
$607 9,996 $207 14 - - - - $244 - $607
9,996
kWh
$207
14
kW-months/year
-
-
MMBtu
-
-
Tgal
$244
-
$
TOTAL RECOMMENDED Savings:
$126,886
Cost:
$122,722
$54,253 893,796 $5,581 379 $14,113 2,543 $51,417 16,025 $1,522 - $54,253
893,796
kWh
$5,581
379
kW-months/year
$14,113
2,543
MMBtu
$51,417
16,025
Tgal
$1,522
-
$
TOTAL IMPLEMENTED Savings:
$23,336
Cost:
$77,613
$17,037 280,673 $4,527 307 $250 45 - - $1,522 - $17,037
280,673
kWh
$4,527
307
kW-months/year
$250
45
MMBtu
-
-
Tgal
$1,522
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes