IAC Assessment: UD0948
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0948
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2016
Principal Product High Pressure Die-Cast Aluminum Automotive Parts
NAICS 331523 - Nonferrous Metal Die-Casting Foundries
SIC 3363 - Aluminum Die-castings
Sales $100,000,000-$500,000,000
# of Employees 907
Plant Area (Sq.Ft.) 418,855
Annual Production 87,098,073 Pounds
Production Hrs. Annual 7,200
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,026,944 56,966,360 kWh $0.05
Electricity Demand $455,759 98,340 kW-months/year $4.63
Electricity Fees $23,139 - $ -
Natural Gas $2,310,727 308,045 MMBtu $7.50
TOTAL ENERGY COSTS $6,016,345
RECOMMENDED SAVINGS* $970,112 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $226,150
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Administrative Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Administrative Changes Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ Tgal
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$353,342
Cost:
$60,000
- - - - - - $353,342 47,376 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$353,342
47,376
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$23,367
Cost:
$2,838
- - - - - - $23,367 3,133 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$23,367
3,133
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$49,905
Cost:
$20,000
- - - - - - $49,905 6,732 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$49,905
6,732
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$35,398
Cost:
-
$35,720 677,029 $4,478 967 - - - - - - $(-4,800) - - - $35,720
677,029
kWh
$4,478
967
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$(-4,800)
-
$
-
-
Tgal
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,997
Cost:
$50
$2,663 50,482 $334 72 - - - - - - - - - - $2,663
50,482
kWh
$334
72
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$87,713
Cost:
$52,000
$(-2,772) (-52,536) $(-333) (-72) - - $90,818 12,251 - - - - - - $(-2,772)
(-52,536)
kWh
$(-333)
(-72)
kW-months/year
-
-
$
$90,818
12,251
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$38,094
Cost:
-
- - - - - - $38,094 5,139 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$38,094
5,139
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,880
Cost:
$60,000
- - - - $11,880 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$11,880
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
09: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$105,009
Cost:
$700
- - - - - - - - $105,009 21,941 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$105,009
21,941
Tgal
-
-
$
-
-
Tgal
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,006
Cost:
$5,000
$1,750 33,174 $256 55 - - - - - - - - - - $1,750
33,174
kWh
$256
55
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$64,945
Cost:
$360,069
$52,232 990,000 $7,640 1,650 - - - - - - $5,073 - - - $52,232
990,000
kWh
$7,640
1,650
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$5,073
-
$
-
-
Tgal
12: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$195,456
Cost:
$17,000
$(-729) (-13,808) $(-230) (-50) - - - - $99,503 20,790 - - $96,912 - $(-729)
(-13,808)
kWh
$(-230)
(-50)
kW-months/year
-
-
$
-
-
MMBtu
$99,503
20,790
Tgal
-
-
$
$96,912
-
Tgal
TOTAL RECOMMENDED Savings:
$970,112
Cost:
$577,657
$88,864 1,684,341 $12,145 2,623 $11,880 - $555,526 74,631 $204,512 42,730 $273 - $96,912 - $88,864
1,684,341
kWh
$12,145
2,623
kW-months/year
$11,880
-
$
$555,526
74,631
MMBtu
$204,512
42,730
Tgal
$273
-
$
$96,912
-
Tgal
TOTAL IMPLEMENTED Savings:
$226,150
Cost:
$412,069
$85,180 1,614,493 $11,785 2,545 - - $128,912 17,390 - - $273 - - - $85,180
1,614,493
kWh
$11,785
2,545
kW-months/year
-
-
$
$128,912
17,390
MMBtu
-
-
Tgal
$273
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Administrative Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Administrative Changes Water Consumption