IAC logo
IAC Assessment: UD0949
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0949
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2016
Principal Product Welded Wire Mesh Concrete Reinforcement
NAICS 332618 - Other Fabricated Wire Product Manufacturing
SIC 3496 - Misc. Fabricated Wire Products
Sales $50,000,000-$100,000,000
# of Employees 70
Plant Area (Sq.Ft.) 133,100
Annual Production 66,526 Tons
Production Hrs. Annual 7,920
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $447,691 7,246,800 kWh $0.06
Electricity Demand $150,244 16,908 kW-months/year $8.89
Electricity Fees $10,341 - $ -
Natural Gas $26,202 3,530 MMBtu $7.42
TOTAL ENERGY COSTS $634,478
RECOMMENDED SAVINGS* $57,546 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,115
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$36,312
Cost:
$5,400
$29,602 495,923 $6,710 751 - - - - $29,602
495,923
kWh
$6,710
751
kW-months/year
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,698
Cost:
$2,125
$1,384 23,186 $314 35 - - - - $1,384
23,186
kWh
$314
35
kW-months/year
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,691
Cost:
$2,800
$1,449 24,270 $242 27 - - - - $1,449
24,270
kWh
$242
27
kW-months/year
-
-
$
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,976
Cost:
$4,120
- - - - $9,976 - - - -
-
kWh
-
-
kW-months/year
$9,976
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$807
Cost:
$1,000
$658 11,019 $149 17 - - - - $658
11,019
kWh
$149
17
kW-months/year
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$66
Cost:
$500
$53 896 $13 2 - - - - $53
896
kWh
$13
2
kW-months/year
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,996
Cost:
$57,770
$4,537 76,003 $2,238 251 - - $221 - $4,537
76,003
kWh
$2,238
251
kW-months/year
-
-
$
$221
-
$
TOTAL RECOMMENDED Savings:
$57,546
Cost:
$73,715
$37,683 631,297 $9,666 1,082 $9,976 - $221 - $37,683
631,297
kWh
$9,666
1,082
kW-months/year
$9,976
-
$
$221
-
$
TOTAL IMPLEMENTED Savings:
$44,115
Cost:
$64,170
$34,797 582,945 $9,097 1,019 - - $221 - $34,797
582,945
kWh
$9,097
1,019
kW-months/year
-
-
$
$221
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes