IAC logo
IAC Assessment: UD0963
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0963
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2017
Principal Product Sunroofs
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 380
Plant Area (Sq.Ft.) 128,755
Annual Production 1,096,625 Units
Production Hrs. Annual 5,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $263,110 3,556,000 kWh $0.07
Electricity Demand $42,159 8,448 kW-months/year $4.99
Electricity Fees $2,462 - $ -
Natural Gas $91,718 16,682 MMBtu $5.50
TOTAL ENERGY COSTS $428,743
RECOMMENDED SAVINGS* $45,835 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,371
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$8,133
Cost:
$4,500
$8,133 109,694 - - - - - - $8,133
109,694
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$4,232
Cost:
$400
- - - - $4,232 769 - - -
-
kWh
-
-
kW-months/year
$4,232
769
MMBtu
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,139
Cost:
-
$3,139 42,342 - - - - - - $3,139
42,342
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$1,358
Cost:
$548
- - - - $1,358 247 - - -
-
kWh
-
-
kW-months/year
$1,358
247
MMBtu
-
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$8,870
Cost:
$37,000
$8,168 110,160 $702 204 - - - - $8,168
110,160
kWh
$702
204
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$5,095
Cost:
$4,624
$5,095 68,717 - - - - - - $5,095
68,717
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,311
Cost:
-
$4,193 56,549 $278 81 - - $(-2,160) - $4,193
56,549
kWh
$278
81
kW-months/year
-
-
MMBtu
$(-2,160)
-
$
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$648
Cost:
-
$481 6,486 $167 49 - - - - $481
6,486
kWh
$167
49
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,428
Cost:
$3,701
$1,168 15,748 $260 76 - - - - $1,168
15,748
kWh
$260
76
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,250
Cost:
$3,655
$1,840 24,821 $410 119 - - - - $1,840
24,821
kWh
$410
119
kW-months/year
-
-
MMBtu
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,727
Cost:
$21,847
$4,982 67,200 $555 161 - - $190 - $4,982
67,200
kWh
$555
161
kW-months/year
-
-
MMBtu
$190
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,242
Cost:
$7,925
$1,774 23,929 $329 96 - - $139 - $1,774
23,929
kWh
$329
96
kW-months/year
-
-
MMBtu
$139
-
$
13: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$402
Cost:
$630
$362 4,885 $40 12 - - - - $362
4,885
kWh
$40
12
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$45,835
Cost:
$84,830
$39,335 530,531 $2,741 797 $5,590 1,016 $(-1,831) - $39,335
530,531
kWh
$2,741
797
kW-months/year
$5,590
1,016
MMBtu
$(-1,831)
-
$
TOTAL IMPLEMENTED Savings:
$7,371
Cost:
$400
$3,139 42,342 - - $4,232 769 - - $3,139
42,342
kWh
-
-
kW-months/year
$4,232
769
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes