Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2017 |
Principal Product | Sandwiches |
NAICS | 311611 - Animal (except Poultry) Slaughtering |
SIC | 2011 - Meat Packing Plants |
Sales | $10,000,000-$50,000,000 |
# of Employees | 96 |
Plant Area (Sq.Ft.) | 77,546 |
Annual Production | 58,000,000 Units |
Production Hrs. Annual | 8,400 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $367,118 | 4,400,724 | kWh | $0.08 |
Electricity Demand | $26,979 | 8,592 | kW-months/year | $3.14 |
Electricity Fees | $2,423 | - | $ | - |
Natural Gas | $61,997 | 11,408 | MMBtu | $5.43 |
TOTAL ENERGY COSTS | $483,636 | |||
RECOMMENDED SAVINGS* | $126,729 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $97,250 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $6,857 Cost: - |
$6,857 | 94,050 | - | - | - | - | - | - | - | - | - | - |
$6,857 94,050 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $303 Cost: - |
$280 | 3,840 | $23 | 7 | - | - | - | - | - | - | - | - |
$280 3,840 kWh |
$23 7 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.2172 USE AUTOMATIC CLEANING EQUIPMENT |
Savings: $15,770 Cost: - |
$(-1,208) | (-16,575) | $(-294) | (-94) | $6,163 | 1,135 | $11,109 | 1,598 | - | - | - | - |
$(-1,208) (-16,575) kWh |
$(-294) (-94) kW-months/year |
$6,163 1,135 MMBtu |
$11,109 1,598 Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $6,437 Cost: $700 |
- | - | - | - | - | - | - | - | $6,437 | 1,764 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$6,437 1,764 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS |
Savings: $26,366 Cost: $2,000 |
$24,897 | 341,480 | $1,469 | 468 | - | - | - | - | - | - | - | - |
$24,897 341,480 kWh |
$1,469 468 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $14,440 Cost: $80,000 |
$14,134 | 193,859 | $306 | 98 | - | - | - | - | - | - | - | - |
$14,134 193,859 kWh |
$306 98 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $4,537 Cost: $10,000 |
$4,284 | 58,754 | $253 | 81 | - | - | - | - | - | - | - | - |
$4,284 58,754 kWh |
$253 81 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,342 Cost: $200 |
$3,156 | 43,283 | $186 | 59 | - | - | - | - | - | - | - | - |
$3,156 43,283 kWh |
$186 59 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION |
Savings: $5,101 Cost: - |
$3,099 | 42,505 | $183 | 58 | $1,819 | 335 | - | - | - | - | - | - |
$3,099 42,505 kWh |
$183 58 kW-months/year |
$1,819 335 MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $41,935 Cost: $20,000 |
$39,599 | 543,120 | $2,336 | 744 | - | - | - | - | - | - | - | - |
$39,599 543,120 kWh |
$2,336 744 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $560 Cost: $300 |
$560 | 7,677 | - | - | - | - | - | - | - | - | - | - |
$560 7,677 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,081 Cost: $1,230 |
$1,057 | 14,510 | $56 | 18 | - | - | - | - | - | - | $(-32) | - |
$1,057 14,510 kWh |
$56 18 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
$(-32) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $126,729 Cost: $114,430 |
$96,715 | 1,326,503 | $4,518 | 1,439 | $7,982 | 1,470 | $11,109 | 1,598 | $6,437 | 1,764 | $(-32) | - | $96,715 1,326,503 kWh |
$4,518 1,439 kW-months/year |
$7,982 1,470 MMBtu |
$11,109 1,598 Tgal |
$6,437 1,764 Tgal |
$(-32) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $97,250 Cost: $24,230 |
$68,004 | 932,717 | $3,750 | 1,195 | $7,982 | 1,470 | $11,109 | 1,598 | $6,437 | 1,764 | $(-32) | - | $68,004 932,717 kWh |
$3,750 1,195 kW-months/year |
$7,982 1,470 MMBtu |
$11,109 1,598 Tgal |
$6,437 1,764 Tgal |
$(-32) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Personnel Changes |