IAC logo
IAC Assessment: UD0975
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0975
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2017
Principal Product Food packaging
NAICS 326112 - Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 3087 - Custom Compound Purchased Resins
Sales $10,000,000-$50,000,000
# of Employees 97
Plant Area (Sq.Ft.) 238,602
Annual Production 42,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,234,057 17,188,413 kWh $0.07
Natural Gas $10,821 1,572 MMBtu $6.88
TOTAL ENERGY COSTS $1,244,878
RECOMMENDED SAVINGS* $158,354 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $92,721
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Electricity Usage Personnel Changes
$ kWh $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$14,600
Cost:
-
$14,600 203,100 - - $14,600
203,100
kWh
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,179
Cost:
-
$3,179 44,149 - - $3,179
44,149
kWh
-
-
$
03: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$17,029
Cost:
$68
$17,029 236,520 - - $17,029
236,520
kWh
-
-
$
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$9,406
Cost:
$500
$9,406 130,637 - - $9,406
130,637
kWh
-
-
$
05: 2.2514 COVER OPEN TANKS Savings:
$29,884
Cost:
$2,350
$29,884 415,050 - - $29,884
415,050
kWh
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$16,737
Cost:
$2,000
$16,737 232,465 - - $16,737
232,465
kWh
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,640
Cost:
$1,600
$7,640 106,112 - - $7,640
106,112
kWh
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,964
Cost:
$2,000
$4,964 68,950 - - $4,964
68,950
kWh
-
-
$
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,684
Cost:
$1,500
$1,684 23,400 - - $1,684
23,400
kWh
-
-
$
10: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$4,642
Cost:
$5,000
$4,642 64,469 - - $4,642
64,469
kWh
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$45,148
Cost:
$47,000
$44,056 611,883 $1,092 - $44,056
611,883
kWh
$1,092
-
$
12: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,441
Cost:
$1,931
$3,039 42,208 $402 - $3,039
42,208
kWh
$402
-
$
TOTAL RECOMMENDED Savings:
$158,354
Cost:
$63,949
$156,860 2,178,943 $1,494 - $156,860
2,178,943
kWh
$1,494
-
$
TOTAL IMPLEMENTED Savings:
$92,721
Cost:
$52,099
$91,227 1,267,372 $1,494 - $91,227
1,267,372
kWh
$1,494
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Personnel Changes Electricity Usage Personnel Changes