IAC Assessment: UD0976
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0976
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2017
Principal Product Decorative exhaust, shims, gaskets
NAICS 336370 - Motor Vehicle Metal Stamping
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 154,039
Annual Production 2,574,244 Units
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,712 3,154,880 kWh $0.05
Natural Gas $36,042 7,857 MMBtu $4.59
TOTAL ENERGY COSTS $186,754
RECOMMENDED SAVINGS* $60,302 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Fees Natural Gas Primary Raw Material Ancillary Material Cost
$ kWh $ $ $ MMBtu $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,704
Cost:
$1,000
- - $2,704 - - - - - - - -
-
kWh
$2,704
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$11,604
Cost:
$10,000
- - - - - - $11,604 - - - -
-
kWh
-
-
$
-
-
MMBtu
$11,604
-
$
-
-
$
03: 2.7314 REDUCE VENTILATION AIR Savings:
$2,584
Cost:
$3,000
- - - - $2,584 563 - - - - -
-
kWh
-
-
$
$2,584
563
MMBtu
-
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$471
Cost:
-
$86 1,792 - - $385 84 - - - - $86
1,792
kWh
-
-
$
$385
84
MMBtu
-
-
$
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,352
Cost:
$21,000
$8,352 174,000 - - - - - - - - $8,352
174,000
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,239
Cost:
$30
$1,239 25,818 - - - - - - - - $1,239
25,818
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,559
Cost:
$2,000
$1,559 32,484 - - - - - - - - $1,559
32,484
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,903
Cost:
$1,500
$10,903 227,145 - - - - - - - - $10,903
227,145
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
09: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$3,345
Cost:
$10,950
$3,345 69,693 - - - - - - - - $3,345
69,693
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,649
Cost:
-
$1,649 34,363 - - - - - - - - $1,649
34,363
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
11: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,012
Cost:
-
$1,012 21,075 - - - - - - - - $1,012
21,075
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,115
Cost:
$31,736
$10,273 214,018 - - - - - - $2,842 - $10,273
214,018
kWh
-
-
$
-
-
MMBtu
-
-
$
$2,842
-
$
13: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$992
Cost:
$1,230
$852 17,741 - - - - - - $140 - $852
17,741
kWh
-
-
$
-
-
MMBtu
-
-
$
$140
-
$
14: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$671
Cost:
$180
$584 12,165 - - - - - - $87 - $584
12,165
kWh
-
-
$
-
-
MMBtu
-
-
$
$87
-
$
15: 2.2511 INSULATE BARE EQUIPMENT Savings:
$102
Cost:
$420
$102 2,125 - - - - - - - - $102
2,125
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$60,302
Cost:
$83,046
$39,956 832,419 $2,704 - $2,969 647 $11,604 - $3,069 - $39,956
832,419
kWh
$2,704
-
$
$2,969
647
MMBtu
$11,604
-
$
$3,069
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Fees Natural Gas Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Fees Natural Gas Primary Raw Material Ancillary Material Cost