IAC logo
IAC Assessment: UD0977
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0977
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2017
Principal Product Powertrain, Balance Shaft Components
NAICS 336350 - Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 141
Plant Area (Sq.Ft.) 106,000
Annual Production 48,000 Units
Production Hrs. Annual 8,400
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $913,175 9,471,468 kWh $0.10
Natural Gas $7,513 1,188 MMBtu $6.32
TOTAL ENERGY COSTS $920,688
RECOMMENDED SAVINGS* $152,794 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,668
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Personnel Changes Electricity Usage Electricity Fees Personnel Changes
$ kWh $ $ $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$12,684
Cost:
$6,500
$12,684 131,574 - - - - $12,684
131,574
kWh
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,960
Cost:
-
$9,960 103,320 - - - - $9,960
103,320
kWh
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,231
Cost:
-
$9,231 95,760 - - - - $9,231
95,760
kWh
-
-
$
-
-
$
04: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$47,239
Cost:
$23,800
$47,239 490,031 - - - - $47,239
490,031
kWh
-
-
$
-
-
$
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$34,880
Cost:
-
$34,880 361,829 - - - - $34,880
361,829
kWh
-
-
$
-
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$16,048
Cost:
$2,000
$16,048 166,472 - - - - $16,048
166,472
kWh
-
-
$
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,320
Cost:
$6,000
- - $3,320 - - - -
-
kWh
$3,320
-
$
-
-
$
08: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$745
Cost:
-
$684 7,096 - - $61 - $684
7,096
kWh
-
-
$
$61
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,687
Cost:
$57,949
$11,418 118,444 - - $7,269 - $11,418
118,444
kWh
-
-
$
$7,269
-
$
TOTAL RECOMMENDED Savings:
$152,794
Cost:
$96,249
$142,144 1,474,526 $3,320 - $7,330 - $142,144
1,474,526
kWh
$3,320
-
$
$7,330
-
$
TOTAL IMPLEMENTED Savings:
$48,668
Cost:
$8,500
$48,607 504,222 - - $61 - $48,607
504,222
kWh
-
-
$
$61
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Electricity Fees Personnel Changes Electricity Usage Electricity Fees Personnel Changes