IAC Assessment: UD0985
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0985
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2018
Principal Product Pumps
NAICS 333911 - Pump and Pumping Equipment Manufacturing
SIC 3561 - Pumps And Pumping Equipment
Sales $50,000,000-$100,000,000
# of Employees 175
Plant Area (Sq.Ft.) 191,000
Annual Production 72,258 Units
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,287 2,827,092 kWh $0.05
Electricity Demand $124,441 8,214 kW-months/year $15.15
Electricity Fees $780 - $ -
Natural Gas $14,172 1,485 MMBtu $9.54
TOTAL ENERGY COSTS $282,688
RECOMMENDED SAVINGS* $51,006 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,748
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes By-product Production
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,113
Cost:
-
$2,113 44,474 - - - - - - - - $2,113
44,474
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,260
Cost:
$1,000
$1,989 43,641 $1,271 84 - - - - - - $1,989
43,641
kWh
$1,271
84
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$957
Cost:
$2,500
$666 14,016 $291 19 - - - - - - $666
14,016
kWh
$291
19
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$938
Cost:
-
$574 12,840 $364 24 - - - - - - $574
12,840
kWh
$364
24
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$320
Cost:
$1,500
$223 4,688 $97 6 - - - - - - $223
4,688
kWh
$97
6
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,998
Cost:
$55,816
$2,589 54,510 $3,964 262 - - $6,445 - - - $2,589
54,510
kWh
$3,964
262
kW-months/year
-
-
lb
$6,445
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$30,420
Cost:
$25,000
- - - - $36,000 4,000 $(-7,380) - $1,800 - -
-
kWh
-
-
kW-months/year
$36,000
4,000
lb
$(-7,380)
-
$
$1,800
-
$
TOTAL RECOMMENDED Savings:
$51,006
Cost:
$85,816
$8,154 174,169 $5,987 395 $36,000 4,000 $(-935) - $1,800 - $8,154
174,169
kWh
$5,987
395
kW-months/year
$36,000
4,000
lb
$(-935)
-
$
$1,800
-
$
TOTAL IMPLEMENTED Savings:
$49,748
Cost:
$84,316
$7,357 156,641 $5,526 365 $36,000 4,000 $(-935) - $1,800 - $7,357
156,641
kWh
$5,526
365
kW-months/year
$36,000
4,000
lb
$(-935)
-
$
$1,800
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes By-product Production