Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2019 |
Principal Product | Cheese |
NAICS | 311513 - Cheese Manufacturing |
SIC | 2022 - Cheese, Natural And Processed |
Sales | $10,000,000-$50,000,000 |
# of Employees | 43 |
Plant Area (Sq.Ft.) | 75,000 |
Annual Production | 14,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $535,740 | 6,646,900 | kWh | $0.08 |
Electricity Demand | $82,889 | 18,024 | kW-months/year | $4.60 |
Electricity Fees | $10,982 | - | $ | - |
Natural Gas | $186,689 | 32,907 | MMBtu | $5.67 |
TOTAL ENERGY COSTS | $816,300 | |||
RECOMMENDED SAVINGS* | $170,652 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,916 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $3,767 Cost: - |
$3,487 | 43,267 | $280 | 59 | - | - | - | - |
$3,487 43,267 kWh |
$280 59 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,443 Cost: $1,500 |
$2,443 | 30,311 | - | - | - | - | - | - |
$2,443 30,311 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $5,974 Cost: $1,800 |
- | - | - | - | $5,974 | 1,054 | - | - |
- - kWh |
- - kW-months/year |
$5,974 1,054 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,159 Cost: $3,500 |
- | - | $1,159 | 232 | - | - | - | - |
- - kWh |
$1,159 232 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $110,256 Cost: $150,000 |
$44,930 | 557,440 | $5,273 | 1,116 | $60,053 | 10,591 | - | - |
$44,930 557,440 kWh |
$5,273 1,116 kW-months/year |
$60,053 10,591 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $35,713 Cost: $75,000 |
$15,284 | 189,633 | - | - | $20,429 | 3,603 | - | - |
$15,284 189,633 kWh |
- - kW-months/year |
$20,429 3,603 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $5,847 Cost: $11,694 |
- | - | - | - | $5,847 | 1,031 | - | - |
- - kWh |
- - kW-months/year |
$5,847 1,031 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $606 Cost: - |
$606 | 7,520 | - | - | - | - | - | - |
$606 7,520 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,887 Cost: $17,856 |
$5,151 | 63,913 | $414 | 88 | - | - | $(-678) | - |
$5,151 63,913 kWh |
$414 88 kW-months/year |
- - MMBtu |
$(-678) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $170,652 Cost: $261,350 |
$71,901 | 892,084 | $7,126 | 1,495 | $92,303 | 16,279 | $(-678) | - | $71,901 892,084 kWh |
$7,126 1,495 kW-months/year |
$92,303 16,279 MMBtu |
$(-678) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,916 Cost: $36,350 |
$8,200 | 101,744 | $1,573 | 320 | $11,821 | 2,085 | $(-678) | - | $8,200 101,744 kWh |
$1,573 320 kW-months/year |
$11,821 2,085 MMBtu |
$(-678) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |