IAC logo
IAC Assessment: UD0998
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0998
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2019
Principal Product Air Craft Engine Components
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 150,000
Annual Production 78,000 Units
Production Hrs. Annual 8,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $358,427 6,973,278 kWh $0.05
Electricity Demand $85,395 15,873 kW-months/year $5.38
Electricity Fees $77,949 - $ -
Natural Gas $13,271 1,276 MMBtu $10.40
TOTAL ENERGY COSTS $545,933
RECOMMENDED SAVINGS* $38,937 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,128
Cost:
-
$13,231 257,413 $1,897 348 - - $(-5,000) - $13,231
257,413
kWh
$1,897
348
kW-months/year
-
-
Tgal
$(-5,000)
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,093
Cost:
-
$956 18,604 $137 25 - - - - $956
18,604
kWh
$137
25
kW-months/year
-
-
Tgal
-
-
$
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$10,815
Cost:
$2,500
$9,947 193,520 $868 162 - - - - $9,947
193,520
kWh
$868
162
kW-months/year
-
-
Tgal
-
-
$
04: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$1,888
Cost:
$40
$1,561 30,360 $327 61 - - - - $1,561
30,360
kWh
$327
61
kW-months/year
-
-
Tgal
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$965
Cost:
$280
$965 18,772 - - - - - - $965
18,772
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$7,189
Cost:
$3,500
- - - - $7,189 1,675 - - -
-
kWh
-
-
kW-months/year
$7,189
1,675
Tgal
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,380
Cost:
$1,315
$2,956 57,512 $424 79 - - - - $2,956
57,512
kWh
$424
79
kW-months/year
-
-
Tgal
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,135
Cost:
$5,000
$1,868 36,344 $267 50 - - - - $1,868
36,344
kWh
$267
50
kW-months/year
-
-
Tgal
-
-
$
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,344
Cost:
$2,520
$1,344 26,140 - - - - - - $1,344
26,140
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$38,937
Cost:
$15,155
$32,828 638,665 $3,920 724 $7,189 1,675 $(-5,000) - $32,828
638,665
kWh
$3,920
724
kW-months/year
$7,189
1,675
Tgal
$(-5,000)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes