Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2019 |
Principal Product | Auto Parts |
NAICS | 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | >$500,000,000 |
# of Employees | 800 |
Plant Area (Sq.Ft.) | 417,000 |
Annual Production | 4,400,000 Units |
Production Hrs. Annual | 6,600 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,591,942 | 24,047,466 | kWh | $0.07 |
Electricity Demand | $18,897 | 51,072 | kW-months/year | $0.37 |
Electricity Fees | $118,340 | - | $ | - |
Natural Gas | $69,307 | 17,391 | MMBtu | $3.99 |
TOTAL ENERGY COSTS | $1,798,485 | |||
RECOMMENDED SAVINGS* | $138,148 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $33,605 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $12,280 Cost: - |
$12,280 | 185,493 | - | - | - | - | - | - |
$12,280 185,493 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $4,606 Cost: - |
$4,560 | 68,877 | $46 | 125 | - | - | - | - |
$4,560 68,877 kWh |
$46 125 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $1,599 Cost: - |
$1,592 | 24,056 | $7 | 18 | - | - | - | - |
$1,592 24,056 kWh |
$7 18 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $2,318 Cost: $290 |
- | - | - | - | $2,318 | 581 | - | - |
- - kWh |
- - kW-months/year |
$2,318 581 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $2,102 Cost: - |
$145 | 2,187 | - | - | $1,957 | 490 | - | - |
$145 2,187 kWh |
- - kW-months/year |
$1,957 490 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $71,143 Cost: $12,480 |
$71,143 | 1,074,668 | - | - | - | - | - | - |
$71,143 1,074,668 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $24,374 Cost: $48,748 |
$(-721) | (-10,892) | $(-6) | (-15) | $25,100 | 6,291 | - | - |
$(-721) (-10,892) kWh |
$(-6) (-15) kW-months/year |
$25,100 6,291 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $17,801 Cost: $81,000 |
$14,486 | 218,823 | $147 | 398 | - | - | $3,168 | - |
$14,486 218,823 kWh |
$147 398 kW-months/year |
- - MMBtu |
$3,168 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,925 Cost: $8,061 |
$1,905 | 28,779 | $19 | 52 | - | - | - | - |
$1,905 28,779 kWh |
$19 52 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $138,148 Cost: $150,579 |
$105,390 | 1,591,991 | $214 | 579 | $29,375 | 7,362 | $3,168 | - | $105,390 1,591,991 kWh |
$214 579 kW-months/year |
$29,375 7,362 MMBtu |
$3,168 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $33,605 Cost: $89,061 |
$30,263 | 457,151 | $173 | 468 | - | - | $3,168 | - | $30,263 457,151 kWh |
$173 468 kW-months/year |
- - MMBtu |
$3,168 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |