Select a Center

Arizona State University
Boise State University
Case Western Reserve University
Clemson University
Colorado State University
Georgia Institute of Technology
Indiana University-Purdue University
Lehigh University
Louisiana State University
North Carolina State
Oklahoma State University
Oregon State University
San Diego State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Kentucky
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of Texas Rio Grande Valley
University of Utah
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
IAC Assessment: UD1007
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: UD1007
IAC Center University of Dayton
Assessment Year 2019
Principal Product Bacon
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $165,000,000
# of Employees 515
Plant Area (Sq.Ft.) 65,000
Annual Production 1,200,000,000 Pieces
Production Hrs. Annual 5,616
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,031,980 34,943,773 kWh $0.06
Electricity Demand $205,368 56,111 kW/month $3.66
Natural Gas $262,217 38,283 MMBtu $6.85
TOTAL ENERGY COSTS $2,499,565
RECOMMENDED SAVINGS* $242,356 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW/month $ $
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$21,932
Cost:
-
$19,332 332,444 $2,600 710 - - $19,332
332,444
kWh
$2,600
710
kW/month
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$924
Cost:
-
$769 13,223 $155 42 - - $769
13,223
kWh
$155
42
kW/month
-
-
$
03: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$87,749
Cost:
$5,000
$78,701 1,353,420 $9,048 2,472 - - $78,701
1,353,420
kWh
$9,048
2,472
kW/month
-
-
$
04: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS Savings:
$80,784
Cost:
$10,000
$74,372 1,278,960 $6,412 1,752 - - $74,372
1,278,960
kWh
$6,412
1,752
kW/month
-
-
$
05: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS Savings:
$4,980
Cost:
-
$4,585 78,840 $395 108 - - $4,585
78,840
kWh
$395
108
kW/month
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,566
Cost:
$4,400
$3,566 61,320 - - - - $3,566
61,320
kWh
-
-
kW/month
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,535
Cost:
$500
$3,535 60,788 - - - - $3,535
60,788
kWh
-
-
kW/month
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,204
Cost:
-
$2,204 37,907 - - - - $2,204
37,907
kWh
-
-
kW/month
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,737
Cost:
$1,000
$1,848 31,784 $249 68 $(-360) - $1,848
31,784
kWh
$249
68
kW/month
$(-360)
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,710
Cost:
$34,800
$18,898 324,991 $3,812 1,042 - - $18,898
324,991
kWh
$3,812
1,042
kW/month
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,235
Cost:
$23,550
$10,850 186,588 $935 256 $450 - $10,850
186,588
kWh
$935
256
kW/month
$450
-
$
TOTAL RECOMMENDED Savings:
$242,356
Cost:
$79,250
$218,660 3,760,265 $23,606 6,450 $90 - $218,660
3,760,265
kWh
$23,606
6,450
kW/month
$90
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW/month
-
-
$
Savings
Cost
$ kWh $ kW/month $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes