IAC Assessment: UD1009
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1009
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2020
Principal Product Plasticware
NAICS 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $50,000,000-$100,000,000
# of Employees 280
Plant Area (Sq.Ft.) 200,000
Annual Production 2,400,000,000 Units
Production Hrs. Annual 8,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,025,570 35,315,780 kWh $0.03
Electricity Demand $381,272 64,404 kW-months/year $5.92
Electricity Fees $389,878 - $ -
TOTAL ENERGY COSTS $1,796,720
RECOMMENDED SAVINGS* $404,604 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $151,961
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$32,116
Cost:
-
$25,050 826,616 $7,066 1,194 - - - - $25,050
826,616
kWh
$7,066
1,194
kW-months/year
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,826
Cost:
$1,000
$6,962 239,751 $1,944 328 - - $(-1,080) - $6,962
239,751
kWh
$1,944
328
kW-months/year
-
-
$
$(-1,080)
-
$
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$78,282
Cost:
$44,250
$78,282 2,695,658 - - - - - - $78,282
2,695,658
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,717
Cost:
$4,388
$3,785 130,338 $1,057 179 $(-125) - - - $3,785
130,338
kWh
$1,057
179
kW-months/year
$(-125)
-
$
-
-
$
05: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$107,302
Cost:
$83,000
$93,845 3,231,565 $13,457 2,273 - - - - $93,845
3,231,565
kWh
$13,457
2,273
kW-months/year
-
-
$
-
-
$
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$100,517
Cost:
$151,300
$78,575 2,705,745 $21,942 3,707 - - - - $78,575
2,705,745
kWh
$21,942
3,707
kW-months/year
-
-
$
-
-
$
07: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$73,844
Cost:
$147,736
$57,724 1,987,754 $16,120 2,723 - - - - $57,724
1,987,754
kWh
$16,120
2,723
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$404,604
Cost:
$431,674
$344,223 11,817,427 $61,586 10,404 $(-125) - $(-1,080) - $344,223
11,817,427
kWh
$61,586
10,404
kW-months/year
$(-125)
-
$
$(-1,080)
-
$
TOTAL IMPLEMENTED Savings:
$151,961
Cost:
$88,388
$129,642 4,428,270 $23,524 3,974 $(-125) - $(-1,080) - $129,642
4,428,270
kWh
$23,524
3,974
kW-months/year
$(-125)
-
$
$(-1,080)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes