IAC Assessment: UD1015
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1015
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2020
Principal Product Diary (Milk, Cheese, Sour Cream)
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $50,000,000-$100,000,000
# of Employees 133
Plant Area (Sq.Ft.) 132,800
Annual Production 305,495,091 Units
Production Hrs. Annual 8,760
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $732,572 11,628,120 kWh $0.06
Electricity Demand $9,621 2,364 kW-months/year $4.07
Electricity Fees $118,007 - $ -
Natural Gas $288,157 64,029 MMBtu $4.50
TOTAL ENERGY COSTS $1,148,357
RECOMMENDED SAVINGS* $124,889 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,065
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,207
Cost:
-
$2,946 46,756 $261 64 - - - - $2,946
46,756
kWh
$261
64
kW-months/year
-
-
MMBtu
-
-
$
02: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$6,248
Cost:
$309
$5,740 91,104 $508 125 - - - - $5,740
91,104
kWh
$508
125
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,267
Cost:
-
- - - - $2,267 504 - - -
-
kWh
-
-
kW-months/year
$2,267
504
MMBtu
-
-
$
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$769
Cost:
$1,080
- - - - $769 171 - - -
-
kWh
-
-
kW-months/year
$769
171
MMBtu
-
-
$
05: 2.2627 USE MULTIPLE-EFFECT EVAPORATORS Savings:
$18,945
Cost:
$26,742
$17,405 276,269 $1,540 378 - - - - $17,405
276,269
kWh
$1,540
378
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$7,958
Cost:
-
$6,761 107,310 $1,197 294 - - - - $6,761
107,310
kWh
$1,197
294
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS Savings:
$6,591
Cost:
-
$4,305 68,328 $2,286 564 - - - - $4,305
68,328
kWh
$2,286
564
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$60,442
Cost:
$86,373
$50,592 803,040 $3,847 945 - - $6,003 - $50,592
803,040
kWh
$3,847
945
kW-months/year
-
-
MMBtu
$6,003
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,052
Cost:
$1,854
$8,095 128,498 $702 173 - - $255 - $8,095
128,498
kWh
$702
173
kW-months/year
-
-
MMBtu
$255
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,410
Cost:
$28,400
$8,473 134,490 $937 230 - - - - $8,473
134,490
kWh
$937
230
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$124,889
Cost:
$144,758
$104,317 1,655,795 $11,278 2,772 $3,036 675 $6,258 - $104,317
1,655,795
kWh
$11,278
2,772
kW-months/year
$3,036
675
MMBtu
$6,258
-
$
TOTAL IMPLEMENTED Savings:
$12,065
Cost:
-
$7,251 115,084 $2,547 628 $2,267 504 - - $7,251
115,084
kWh
$2,547
628
kW-months/year
$2,267
504
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes