Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2020 |
Principal Product | Diary (Milk, Cheese, Sour Cream) |
NAICS | 311511 - Fluid Milk Manufacturing |
SIC | 2026 - Fluid Milk |
Sales | $50,000,000-$100,000,000 |
# of Employees | 133 |
Plant Area (Sq.Ft.) | 132,800 |
Annual Production | 305,495,091 Units |
Production Hrs. Annual | 8,760 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $732,572 | 11,628,120 | kWh | $0.06 |
Electricity Demand | $9,621 | 2,364 | kW-months/year | $4.07 |
Electricity Fees | $118,007 | - | $ | - |
Natural Gas | $288,157 | 64,029 | MMBtu | $4.50 |
TOTAL ENERGY COSTS | $1,148,357 | |||
RECOMMENDED SAVINGS* | $124,889 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,065 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,207 Cost: - |
$2,946 | 46,756 | $261 | 64 | - | - | - | - |
$2,946 46,756 kWh |
$261 64 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $6,248 Cost: $309 |
$5,740 | 91,104 | $508 | 125 | - | - | - | - |
$5,740 91,104 kWh |
$508 125 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,267 Cost: - |
- | - | - | - | $2,267 | 504 | - | - |
- - kWh |
- - kW-months/year |
$2,267 504 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $769 Cost: $1,080 |
- | - | - | - | $769 | 171 | - | - |
- - kWh |
- - kW-months/year |
$769 171 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2627 USE MULTIPLE-EFFECT EVAPORATORS |
Savings: $18,945 Cost: $26,742 |
$17,405 | 276,269 | $1,540 | 378 | - | - | - | - |
$17,405 276,269 kWh |
$1,540 378 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $7,958 Cost: - |
$6,761 | 107,310 | $1,197 | 294 | - | - | - | - |
$6,761 107,310 kWh |
$1,197 294 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS |
Savings: $6,591 Cost: - |
$4,305 | 68,328 | $2,286 | 564 | - | - | - | - |
$4,305 68,328 kWh |
$2,286 564 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $60,442 Cost: $86,373 |
$50,592 | 803,040 | $3,847 | 945 | - | - | $6,003 | - |
$50,592 803,040 kWh |
$3,847 945 kW-months/year |
- - MMBtu |
$6,003 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,052 Cost: $1,854 |
$8,095 | 128,498 | $702 | 173 | - | - | $255 | - |
$8,095 128,498 kWh |
$702 173 kW-months/year |
- - MMBtu |
$255 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,410 Cost: $28,400 |
$8,473 | 134,490 | $937 | 230 | - | - | - | - |
$8,473 134,490 kWh |
$937 230 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $124,889 Cost: $144,758 |
$104,317 | 1,655,795 | $11,278 | 2,772 | $3,036 | 675 | $6,258 | - | $104,317 1,655,795 kWh |
$11,278 2,772 kW-months/year |
$3,036 675 MMBtu |
$6,258 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,065 Cost: - |
$7,251 | 115,084 | $2,547 | 628 | $2,267 | 504 | - | - | $7,251 115,084 kWh |
$2,547 628 kW-months/year |
$2,267 504 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |