Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2021 |
Principal Product | Bridge Components |
NAICS | 325520 - Adhesive Manufacturing |
SIC | 3441 - Fabricated Structural Metal |
Sales | $50,000,000-$100,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 225,000 |
Annual Production | 160,000 Units |
Production Hrs. Annual | 5,400 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $299,568 | 5,601,864 | kWh | $0.05 |
Electricity Demand | $111,598 | 16,607 | kW-months/year | $6.72 |
Electricity Fees | $6,144 | - | $ | - |
Natural Gas | $59,714 | 19,555 | MMBtu | $3.05 |
TOTAL ENERGY COSTS | $503,924 | |||
RECOMMENDED SAVINGS* | $63,194 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,467 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,612 Cost: - |
$1,260 | 23,559 | $352 | 52 | - | - | - | - | - | - | - | - |
$1,260 23,559 kWh |
$352 52 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $11,486 Cost: $1,000 |
- | - | - | - | - | - | - | - | $11,486 | 1,021 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$11,486 1,021 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $7,993 Cost: - |
- | - | - | - | - | - | $3,268 | 420 | $4,725 | 420 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,268 420 Tgal |
$4,725 420 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,522 Cost: - |
$2,522 | 47,166 | - | - | - | - | - | - | - | - | - | - |
$2,522 47,166 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,842 Cost: $1,000 |
$1,226 | 22,931 | $616 | 92 | - | - | - | - | - | - | - | - |
$1,226 22,931 kWh |
$616 92 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,443 Cost: - |
- | - | - | - | $1,443 | 473 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,443 473 MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $6,067 Cost: $4,875 |
- | - | - | - | $6,067 | 1,989 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,067 1,989 MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2524 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED |
Savings: $2,481 Cost: $4,300 |
$1,941 | 36,288 | $540 | 81 | - | - | - | - | - | - | - | - |
$1,941 36,288 kWh |
$540 81 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $17,013 Cost: $65,250 |
$10,812 | 202,176 | $3,397 | 505 | - | - | - | - | - | - | $2,804 | - |
$10,812 202,176 kWh |
$3,397 505 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
$2,804 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS |
Savings: $10,735 Cost: $43,000 |
$8,392 | 156,921 | $2,343 | 349 | - | - | - | - | - | - | - | - |
$8,392 156,921 kWh |
$2,343 349 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $63,194 Cost: $119,425 |
$26,153 | 489,041 | $7,248 | 1,078 | $7,510 | 2,462 | $3,268 | 420 | $16,211 | 1,441 | $2,804 | - | $26,153 489,041 kWh |
$7,248 1,078 kW-months/year |
$7,510 2,462 MMBtu |
$3,268 420 Tgal |
$16,211 1,441 Tgal |
$2,804 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,467 Cost: $66,250 |
$13,298 | 248,666 | $4,365 | 649 | - | - | - | - | - | - | $2,804 | - | $13,298 248,666 kWh |
$4,365 649 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
$2,804 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Personnel Changes |