IAC Assessment: UD1027
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1027
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2021
Principal Product Bridge Components
NAICS 325520 - Adhesive Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 225,000
Annual Production 160,000 Units
Production Hrs. Annual 5,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $299,568 5,601,864 kWh $0.05
Electricity Demand $111,598 16,607 kW-months/year $6.72
Electricity Fees $6,144 - $ -
Natural Gas $59,714 19,555 MMBtu $3.05
TOTAL ENERGY COSTS $503,924
RECOMMENDED SAVINGS* $63,194 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,467
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,612
Cost:
-
$1,260 23,559 $352 52 - - - - - - - - $1,260
23,559
kWh
$352
52
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
02: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$11,486
Cost:
$1,000
- - - - - - - - $11,486 1,021 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$11,486
1,021
Tgal
-
-
$
03: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$7,993
Cost:
-
- - - - - - $3,268 420 $4,725 420 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,268
420
Tgal
$4,725
420
Tgal
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,522
Cost:
-
$2,522 47,166 - - - - - - - - - - $2,522
47,166
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,842
Cost:
$1,000
$1,226 22,931 $616 92 - - - - - - - - $1,226
22,931
kWh
$616
92
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,443
Cost:
-
- - - - $1,443 473 - - - - - - -
-
kWh
-
-
kW-months/year
$1,443
473
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
07: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$6,067
Cost:
$4,875
- - - - $6,067 1,989 - - - - - - -
-
kWh
-
-
kW-months/year
$6,067
1,989
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
08: 2.2524 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED Savings:
$2,481
Cost:
$4,300
$1,941 36,288 $540 81 - - - - - - - - $1,941
36,288
kWh
$540
81
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,013
Cost:
$65,250
$10,812 202,176 $3,397 505 - - - - - - $2,804 - $10,812
202,176
kWh
$3,397
505
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$2,804
-
$
10: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$10,735
Cost:
$43,000
$8,392 156,921 $2,343 349 - - - - - - - - $8,392
156,921
kWh
$2,343
349
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$63,194
Cost:
$119,425
$26,153 489,041 $7,248 1,078 $7,510 2,462 $3,268 420 $16,211 1,441 $2,804 - $26,153
489,041
kWh
$7,248
1,078
kW-months/year
$7,510
2,462
MMBtu
$3,268
420
Tgal
$16,211
1,441
Tgal
$2,804
-
$
TOTAL IMPLEMENTED Savings:
$20,467
Cost:
$66,250
$13,298 248,666 $4,365 649 - - - - - - $2,804 - $13,298
248,666
kWh
$4,365
649
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$2,804
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes